Sample Record
Owner Lab
- CT HQ - Sacramento Asphalt Binder Laboratory
DIME Sample ID 2024-08-28-82
Project Information
Project Identifiers | Project ID: 1000261 DEA: 010M6704 EFIS: 0123000054 |
---|---|
DIST-CO-RTE-PM | 01-DN-101-R27.9/31.2 |
Award Date | 06/21/2024 |
Closeout Date | Not set |
Work Description | MICRO-SURFACING, PAVEMENT DELINEATION, AND REPLACE AC SURFACING. |
Location Description | DEL NORTE COUNTY NEAR CRESCENT CITY FROM WASHINGTON BOULEVARD OVERCROSSING TO ELK VALLEY CROSS ROAD |
QA Service Level | 1 (Verified on 04/15/2024) |
Sample Information
Sample Taken Date | 08/28/2024 | Sample Unique Key | 82 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/13/2024 |
Sample type | Acceptance | A brief description of the sample | Emulsion |
The quantity of what the sample constitutes | 2 of 2 bottles | From where was the sample collected | Source |
First name of sampler or witnessed by | Unknown | Last name of sampler or witnessed by | Unknown |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Western Emulsions Inc | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphaltic Emulsion | Emulsion Grade | MSE |
---|---|---|---|
Lot Number | Not set | Sub Lot | Not set |
Dilution Percentage Rate | Not set |
Submitted Tests
DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Submitted By | Verified? | Release Date | Test Comments | Actions |
---|---|---|---|---|---|---|---|---|
No results found. |
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |