Sample Record

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

DIME Sample ID 2017-01-18-3

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 7613
DEA: 071218W4
EFIS: 0700021119
DIST-CO-RTE-PM07-LA-5-29.4/31.6
Award Date11/29/2012
Closeout Date07/31/2023
Work DescriptionREALIGN ROUTE 5 AND RAILROAD TRACKS AND RECONFIGURE ON- AND OFF-RAMPS.
Location DescriptionLOS ANGELES COUNTY IN BURBANK FROM WEST MAGNOLIA BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF BUENA VISTA STREET/WINONA AVENUE UNDERCROSSING
QA Service Level1 (Verified on 10/08/2012)

Sample Information

Sample Taken Date01/18/2017 Sample Unique Key3
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/20/2017
Sample typeQuality Assurance A brief description of the sampleBarGrip XL Coupler
The quantity of what the sample constitutes4 From where was the sample collectedJob Site
First name of sampler or witnessed byMario Last name of sampler or witnessed byMacias
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identificationUnknown Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameGerdau, Integrity Rebar Transportation Laboratory (TL) NumberC672286
Inspector Lot Number from the Transportation Laboratory (TL) FormN/A Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerGerdau Integrity Rebar
Coupler ManufacturerBarSplice Intermediate Assembler or FabricatorUnknown
Rebar Size#11 Coupler ModelBarGrip XL Coupler
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop DiameterUnknown Rebar Hoop FabricatorUnknown
Coupler Component Heat/Lot Number(s)72067884 Rebar Heat Number(s)65024960
Rebar Size 2 Not set Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2017-01-18-3-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory01/20/2017Fred
Yes
01/30/2017necking okay
2017-01-18-3-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory01/20/2017Fred
Yes
01/30/2017necking okay
2017-01-18-3-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory01/20/2017Fred
Yes
01/30/2017Pull Out of Coupler
2017-01-18-3-4CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory01/20/2017Fred
Yes
01/30/2017Pull Out of Coupler

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2017-01-18-3-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2017-01-18-3-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2017-01-18-3-3 CTM 670-December 2013 (Verified)
DIME Test ID: 2017-01-18-3-4 CTM 670-December 2013 (Verified)