Sample Record

Owner Lab

  • CT D07 - Materials Field Laboratory, Unit 1953

DIME Sample ID 2024-09-10-49

Project Information

Project IdentifiersProject ID: 215220
DEA: 07210624
EFIS: 0719000068
DIST-CO-RTE-PM07-LA,SBD-71-1.8/R4.7&R0.0/R0.2
Award Date02/05/2021
Closeout DateNot set
Work DescriptionPLACE STRUCTURE CONCRETE RETAINING WALLS & BOX CULVERT AND PLACE JPCP.
Location DescriptionIN LOS ANGELES AND SAN BERNARDINO COUNTIES IN POMONA AND CHINO HILLS FROM 0.2 MILE SOUTH OF MISSION BOULEVARD OVERCROSSING TO 0.2 MILE OF SAN BERNARDINO COUNTY LINE.
QA Service Level1 (Verified on 03/24/2021)

Sample Information

Sample Taken Date09/10/2024 Sample Unique Key49
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/12/2024
Sample typeAcceptance A brief description of the sample6x12 LCBRS cylinder
The quantity of what the sample constitutes130 CY From where was the sample collectedJob Site
First name of sampler or witnessed byS. Last name of sampler or witnessed byPonnie
Title of samplerTQF QC Telephone number of sampler
Laboratory sample identification24-219 Linked DIME Sample ID
The fabricator/manufacturer/facility nameRobertsons Pomona Transportation Laboratory (TL) Number07-210624
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberSM446B2R
The truck number from where the sample was collectedNA The batch plant ticket number from where the sample was collectedNA
Concrete batch plantRobertsons Pomona The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedtruck chute Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2024-09-10-49-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersArnold Truong, CT D07 - Materials Field Laboratory, Unit 195309/12/2024Robert Achuela
Yes
09/12/2024

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-09-10-49-1 CTM 521-June 2020 (Verified)