Sample Record for 2024-07-18-51

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 993333 DEA: 04264724 EFIS: 0419000068 QA Service Level: 1
DIST-CO-RTE-PM: 04-MRN-101-R20.8/27.1
Work Description: CIP BRIDGES, CONSTRUCT ROADWAY, RETAINING WALLS AND MODIFY ELECTRICAL.
Location Description: MARIN COUNTY IN AND NEAR NOVATO FROM 0.1 MILE SOUTH OF FRANKLIN AVENUE OVERHEAD TO 0.5 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE
Contractor Name: GHILOTTI CONSTRUCTION CO. INC. (RILEY GENAZZI & JOSH SERAFINO)
Contractor Address: 246 GHILOTTI AVE., SANTA ROSA, CA 95407
Resident Engineer: Fabio La Serna Structure Rep.: Jeremy Light

Sample Information

DIME Sample ID: 2024-07-18-51
TL Number from the TL Form:
Sample Submitted By Organization: CT SC - 3672 - Novato Field Office
Sample Organization Contact: (916) 621-8033
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 07/18/2024
Date that the sample was received by the laboratory/organization performing the testing: 07/24/2024
The quantity of what the sample constitutes: 4
A brief description of the sample: #9 Lenton
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier: 27-0090L
Structure name: FAOH Bridge
The fabricator/manufacturer/facility name: CMC Erico

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC
Coupler Manufacturer: Erico
Intermediate Assembler or Fabricator:
Rebar Size: #9
Coupler Model: Lenton T2
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): A233654 / M0186
Rebar Heat Number(s): 9001592
Rebar Size 2 :
Coupler Unique ID: ST-17-01

Test Results

Test 1 of 3

DIME Test ID: 2024-07-18-51-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 07/26/2024
Date Tested: 07/26/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
1No. 9/29mm1-0.001119357693576Service Spliceaauvinen
UTM 400kip
Temperature 72.00 f
Halo ID Small

Test 2 of 3

DIME Test ID: 2024-07-18-51-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 07/26/2024
Date Tested: 07/26/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
2No. 9/29mm1019349993499Service Spliceaauvinen
UTM 400kip
Temperature 72.00 f
Halo ID

Test 3 of 3

DIME Test ID: 2024-07-18-51-7
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 07/26/2024
Date Tested: 07/26/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
3No. 9/29mm1019597295972Service Spliceaauvinen
UTM 400kip
Temperature 72.00 f
Halo ID

Tests Assigned to this Sample

DIME Test IDTest MethodAssigned DateTest DateAssigned ByAssigned LabTest CommentsAssigned To
2024-07-18-51-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)07/24/202407/26/2024Josh VelonoCT HQ - Sacramento Structural Materials Testing LaboratoryPlease submit the results to Mr. Nou
2024-07-18-51-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)07/24/202407/26/2024Josh VelonoCT HQ - Sacramento Structural Materials Testing LaboratoryPlease submit results to Mr.Nou (Service Splice)
2024-07-18-51-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)07/24/202407/26/2024Josh VelonoCT HQ - Sacramento Structural Materials Testing LaboratoryPlease submit results to Mr.Nou (Service Splice)
2024-07-18-51-4CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)07/24/202407/26/2024Josh VelonoCT HQ - Sacramento Structural Materials Testing LaboratoryPlease submit results to Mr.Nou (Service Splice)