Print Report | Back to Sample Detail

Sample Record for 2016-11-30-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 210808 DEA: 020E0904 EFIS: 0200000016 QA Service Level: 1
DIST-CO-RTE-PM: 02-SHA-5-R29.3/R31.1,R45.0/R45.8
Work Description: REPLACE BRIDGE, REALIGN ROADWAY AND SEISMIC RETROFIT
Location Description: IN SHASTA COUNTY ABT 8 MI N OF SHASTA LAKE CTY AND NEAR LAKEHEAD FRM TURNTABLE BAY O/C TO 0.1 MI N OF O'BRIEN SRRA & FRM 0.4 MI S TO 0.3 MI N OF DOG CREEK BRIDGE.
Contractor Name: GOLDEN STATE BRIDGE, INC.
Contractor Address: 3701 Mallard Drive, Benicia, CA 94510
Resident Engineer: Nathan Alexander Structure Rep.: Christopher S 'Chris' Brace

Sample Information

DIME Sample ID: 2016-11-30-1
TL Number from the TL Form: C691783
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 11/30/2016
Date that the sample was received by the laboratory/organization performing the testing: 11/30/2016
The quantity of what the sample constitutes: 4
A brief description of the sample: Bartec Couplers
From where was the sample collected: Job Site
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Nucor Dextra America

Material Information

Production or Authorization Testing: Authorization Testing
Service or Ultimate: Ultimate
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Nucor
Coupler Manufacturer: Dextra America
Intermediate Assembler or Fabricator: Unknown
Rebar Size: 14
Coupler Model: Bartec
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): MM13102607 Lot C02
Rebar Heat Number(s): SE15101860
Rebar Size 2 :
Coupler Unique ID:

Test Results

Test 1 of 4

DIME Test ID: 2016-11-30-1-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 12/01/2016
Date Tested: 12/01/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Brittle Break at Coupler
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
1C02#14/43mm2.25-0.006816796474651Brittle Break at CouplerBrian
Temperature 72 F
UTM 2000KIP
Halo ID Big

Test 2 of 4

DIME Test ID: 2016-11-30-1-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 12/01/2016
Date Tested: 12/01/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Brittle Break
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
2C02#14/43mm2.25021998597771Brittle BreakBrian
Temperature 72 F
UTM 2000KIP
Halo ID Big

Test 3 of 4

DIME Test ID: 2016-11-30-1-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 12/01/2016
Date Tested: 12/01/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
3C02#14/43mm2.25022438099724necking okayBrian
Temperature 72 F
UTM 2000KIP
Halo ID Big

Test 4 of 4

DIME Test ID: 2016-11-30-1-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 12/01/2016
Date Tested: 12/01/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
4C02#14/43mm2.25021898697327necking okayBrian
Temperature 72 F
UTM 2000KIP
Halo ID Big