Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 211686 DEA: 101E7204 EFIS: 1016000009 MINOR: 10A1792
QA Service Level: 1
DIST-CO-RTE-PM: 10--120-R3.5
Work Description:
Location Description:
Contractor Name: ROBERT J FRANK,INC.
Contractor Address: 2806 Tarmac Road, Redding, CA 96003
Resident Engineer: Obaidullah Rashid Structure Rep.: Unknown
DIME Sample ID: 2016-10-05-8
TL Number from the TL Form: C939544
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 10/05/2016
Date that the sample was received by the laboratory/organization performing the testing: 10/10/2016
The quantity of what the sample constitutes: 4
A brief description of the sample: Flash Welded Rebar Hoops
From where was the sample collected: Fabricator
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: RKR Steel Welding Cascade
Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 132415
Hoop Manufacturer Lot Number(s): 1
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: 5
Diameter of Hoop: 2'-2"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Cascade
Welding Company: RKR Steel Welding
Coating Standards: Uncoated
Weld Type: Flash Welded
DIME Test ID: 2016-10-05-8-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 10/13/2016
Date Tested: 10/12/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 1 | #5/16mm | 0.31 | 29441 | 94970 | necking okay | Brian |
| |
UTM
|
75KIP
|
Temperature
|
72 F
|
DIME Test ID: 2016-10-05-8-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 10/13/2016
Date Tested: 10/12/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 1 | #5/16mm | 0.31 | 29371 | 94740 | necking okay | Brian |
| |
UTM
|
75KIP
|
Temperature
|
72 F
|
DIME Test ID: 2016-10-05-8-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 10/13/2016
Date Tested: 10/12/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 1 | #5/16mm | 0.31 | 29111 | 93910 | necking okay | Brian |
| |
UTM
|
75KIP
|
Temperature
|
72 F
|