Print Report | Back to Sample Detail

Sample Record for 2024-04-03-2

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 994859 DEA: 021H5904 EFIS: 0216000025 QA Service Level: 1
DIST-CO-RTE-PM: 02-SIS-96-43.5,57.0
Work Description: REPLACE CULVERTS WITH BRIDGES, STREAMBED RESTORATION, & LANDSCAPING.
Location Description: SISKIYOU COUNTY AT AND NEAR HAPPY CAMP AT 0.8 MILE WEST OF GORDON\\'S FERRY ROAD AND AT PORTUGUESE CREEK
Contractor Name: J.F. SHEA CONSTRUCTION, INC.
Contractor Address: 17400 CLEAR CREEK ROAD, REDDING, CA 96001
Resident Engineer: Nicholas Riddle Structure Rep.: Jacob Back

Sample Information

DIME Sample ID: 2024-04-03-2
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 04/03/2024
Date that the sample was received by the laboratory/organization performing the testing: 04/05/2024
The quantity of what the sample constitutes: 284
A brief description of the sample: ASTM A706 Grade 60 Hoops
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: TNT Rebar Company

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 1201056572
Hoop Manufacturer Lot Number(s): Lot 1 and Lot 2
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: #6
Diameter of Hoop: 2'-6"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Nucor Utah
Welding Company: TNT Rebar Company
Coating Standards: Uncoated
Weld Type: Flash Welded

Test Results

Test 1 of 6

DIME Test ID: 2024-04-03-2-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 04/08/2024
Date Tested: 04/08/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
116/19mm0.4442075.3095626Ok Neckingaauvinen
UTM 400kip
Temperature 72 f

Test 2 of 6

DIME Test ID: 2024-04-03-2-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 04/08/2024
Date Tested: 04/08/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
216/19mm0.4442034.5895533Ok Neckingaauvinen
UTM 400kip
Temperature 72 f

Test 3 of 6

DIME Test ID: 2024-04-03-2-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 04/08/2024
Date Tested: 04/08/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
316/19mm0.4441997.0095448Ok Neckingaauvinen
UTM 400kip
Temperature 72 f

Test 4 of 6

DIME Test ID: 2024-04-03-2-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 04/08/2024
Date Tested: 04/08/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
126/19mm0.4441852.2095119Ok Neckingaauvinen
UTM 400kip
Temperature 72 f

Test 5 of 6

DIME Test ID: 2024-04-03-2-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 04/08/2024
Date Tested: 04/08/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
226/19mm0.4441890.8295206Ok Neckingaauvinen
UTM 400kip
Temperature 72 f

Test 6 of 6

DIME Test ID: 2024-04-03-2-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 04/08/2024
Date Tested: 04/08/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
326/19mm0.4442083.0095643Ok Neckingaauvinen
UTM 400kip
Temperature 72 f