Project Information

Project ID: 210385 DEA: 11288814 EFIS: 1113000167 QA Service Level: 1
DIST-CO-RTE-PM: 11-SD-11-Var
Work Description: CONSTRUCT FREEWAY TO FREEWAY CONNECTORS.
Location Description: SAN DIEGO COUNTY IN AND NEAR SAN DIEGO AT ROUTE 11/125/905 SEPARATION
Contractor Name: FLATIRON WEST INC
Contractor Address: 1770 LA COSTA MEADOWS DRIVE , SAN MARCOS CA 92078
Resident Engineer: Jared Corbitt Structure Rep.: Anh Ma

Sample Information

DIME Sample ID: 2016-08-18-8
TL Number from the TL Form: C648118
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 08/18/2016
Date that the sample was received by the laboratory/organization performing the testing: 08/22/2016
The quantity of what the sample constitutes: 4
A brief description of the sample: Flash Welded Rebar Hoops
From where was the sample collected: Fabricator
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: TNT Rebar

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): PL14104777
Hoop Manufacturer Lot Number(s): 1 2
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: 4
Diameter of Hoop: 2'-2"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Nucor
Welding Company: TNT Rebar
Coating Standards: Uncoated
Weld Type: Flash Welded

Test Results

Test 1 of 7

DIME Test ID: 2016-08-18-8-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/24/2016
Date Tested: 08/24/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
11#4/13mm0.21856092800Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 2 of 7

DIME Test ID: 2016-08-18-8-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/24/2016
Date Tested: 08/24/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
21#4/13mm0.21847092350Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 3 of 7

DIME Test ID: 2016-08-18-8-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/24/2016
Date Tested: 08/24/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
31#4/13mm0.21860093000Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 4 of 7

DIME Test ID: 2016-08-18-8-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/24/2016
Date Tested: 08/24/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke in Heat Affected Area
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
12#4/13mm0.21843092150Bar Broke in Heat Affected AreaBrian
UTM 400KIP
Temperature 72 F

Test 5 of 7

DIME Test ID: 2016-08-18-8-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/24/2016
Date Tested: 08/24/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
22#4/13mm0.21848092400Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 6 of 7

DIME Test ID: 2016-08-18-8-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/24/2016
Date Tested: 08/24/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke in Heat Affected Area
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
32#4/13mm0.21755087750Bar Broke in Heat Affected AreaBrian
UTM 400KIP
Temperature 72 F

Test 7 of 7

DIME Test ID: 2016-08-18-8-7
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/24/2016
Date Tested: 08/24/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
42#4/13mm0.21845092250Bar BrokeBrian
UTM 400KIP
Temperature 72 F