Print Report | Back to Sample Detail

Sample Record for 2024-01-09-37

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 993544 DEA: 07324904 EFIS: 0716000079 QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-5-20.1/36.0
Work Description: UPGRADE AND REPAIR THREE EXISTING PUMP PLANTS.
Location Description: LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM HUMBOLDT STREET UNDERPASS TO SHELDON STREET OVERCROSSING
Contractor Name: Stacy and Witbeck, INC
Contractor Address: 2800 Harbor Bay Parkway, Alameda, CA, 94502
Resident Engineer: Sam Toutounchian Structure Rep.: Kwangsuk Suh

Sample Information

DIME Sample ID: 2024-01-09-37
TL Number from the TL Form:
Sample Submitted By Organization: Thompson Pipe Group - Los Angeles
Sample Organization Contact: (909) 201-5127
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 01/09/2024
Date that the sample was received by the laboratory/organization performing the testing: 01/12/2024
The quantity of what the sample constitutes: 2.80 yards
A brief description of the sample: 6x12 concrete cylinders
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Thompson pipe group

Material Information

The concrete mix design number: CT 6000 DC
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: 127573
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: conveyor belt
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results

Test 1 of 4

DIME Test ID: 2024-01-09-37-1
Test Method: ASTM C39-10: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C39 - Ground End
Submitted By Organization: Thompson Pipe Group - Los Angeles
Organization Address: 3011 North Laurel Avenue,
Organization City: Rialto
Organization State: CA
Organization Zipcode: 92377
Organization Email: sperry@thompsonpipegroup.com
Organization Phone: (909) 201-5127
Data has not been verified.

Test 2 of 4

DIME Test ID: 2024-01-09-37-2
Test Method: ASTM C39-10: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C39 - Ground End
Submitted By Organization: Thompson Pipe Group - Los Angeles
Organization Address: 3011 North Laurel Avenue,
Organization City: Rialto
Organization State: CA
Organization Zipcode: 92377
Organization Email: sperry@thompsonpipegroup.com
Organization Phone: (909) 201-5127
Data has not been verified.

Test 3 of 4

DIME Test ID: 2024-01-09-37-3
Test Method: ASTM C39-10: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C39 - Ground End
Submitted By Organization: Thompson Pipe Group - Los Angeles
Organization Address: 3011 North Laurel Avenue,
Organization City: Rialto
Organization State: CA
Organization Zipcode: 92377
Organization Email: sperry@thompsonpipegroup.com
Organization Phone: (909) 201-5127
Data has not been verified.

Test 4 of 4

DIME Test ID: 2024-01-09-37-4
Test Method: ASTM C39-10: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C39 - Ground End
Submitted By Organization: Thompson Pipe Group - Los Angeles
Organization Address: 3011 North Laurel Avenue,
Organization City: Rialto
Organization State: CA
Organization Zipcode: 92377
Organization Email: sperry@thompsonpipegroup.com
Organization Phone: (909) 201-5127
Data has not been verified.