Print Report | Back to Sample Detail

Sample Record for 2023-08-07-91

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 215157 DEA: 021H5704 EFIS: 0216000036 QA Service Level: 1
DIST-CO-RTE-PM: 02-SHA-299-67.8/77.8
Work Description: BURNEY CAPM - PAVEMENT REHABILITATION
Location Description: BUNCH GRASS LOOKOUT RD TO NAPA LN
Contractor Name: JF Shea Constrcution
Contractor Address: 17400 Clear Creek Road, Redding, CA 96001
Resident Engineer: Kyle Higgins Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2023-08-07-91
TL Number from the TL Form: 857939
Sample Submitted By Organization: CT D02 - Redding Northern Regional Laboratory
Sample Organization Contact: (530) 225-3194
Type of Sample: Production Start-Up
Type of Material: Aggregate
Sample Taken Date: 08/07/2023
Date that the sample was received by the laboratory/organization performing the testing: 08/07/2023
The quantity of what the sample constitutes: Production Start-Up Evaluation
A brief description of the sample: Mathematically Combined Lime Treated 3/4-inch Type A Aggregate
From where was the sample collected: Manufacturer
Laboratory sample identification: D79307F
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: J.F. Shea Construction — Fawndale Rock and Asphalt (Redding, CA)

Material Information

Source Identification (SMARA, name of Pit or Job Site): 95-45-0017::Fawndale Rock Quarry (Redding, CA)
The fabricator's/manufacturer's product name for the sample:
The fabricator/manufacturer designation for the sample:
The plant number:
A detailed description of where the material sample was collected: Mathematically Combined Gradation per CT 384
Where the material sample would have been placed if not sampled:
Primary Aggregate Nominal Size: 3/4 inch
The concrete mix design number:
Lot number:
Sublot number:
Aggregate Mix Number:

Test Results

Test 1 of 1

DIME Test ID: 2023-08-07-91-1
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Verified Date: 12/28/2023
Date Tested: 12/28/2023
Submitted By Organization: CT D02 - Redding Northern Regional Laboratory
Organization Address: 1657 Riverside Drive,
Organization City: Redding
Organization State: CA
Organization Zipcode: 96001
Organization Email: ward.jenkins@dot.ca.gov
Organization Phone: 530-225-3194
General Comments for this Test: Mathematically combined per CT 384 at 76.4% virgin aggregate from cold feed and 23.6% reclaimed aggregate from RAP: P1″=100.%, P¾″=98%, P½″=86%, P№4=50.%, P№8=29%, P№30=12%, P№200=4.6%
Test Result Compliance: complies
Additional Comments When Verified:
What type of gradation is being tested? HMA Gradation
Cumulative percent passing the 1 1/2 in. sieve 100 %
Cumulative percent passing the 1 in. sieve 100 %
Cumulative percent passing the 3/4 in. sieve 98 %
Cumulative percent passing the 1/2 in. sieve 86 %
Cumulative percent passing the 3/8 in. sieve 76 %
Cumulative percent passing the #4 sieve 50 %
Cumulative percent passing the #8 sieve 29 %
Cumulative percent passing the #16 sieve 18 %
Cumulative percent passing the #30 sieve 12 %
Cumulative percent passing the #50 sieve 8 %
Cumulative percent passing the #100 sieve 6 %
Cumulative percent passing the #200 sieve 4.6 %