Print Report | Back to Sample Detail

Sample Record for 2016-06-07-16

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 3825 DEA: 07138204 EFIS: 0700000142 QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-47,103-3.5/4.6,0.0/1.1
Work Description: REPLACE STEEL BRIDGE WITH CIP PS CONCRETE BOX GIRDER BRIDGE AND RAMPS.
Location Description: LOS ANGELES COUNTY IN LONG BEACH AND LOS ANGELES ON ROUTE 47 FROM OCEAN BOULEVARD TO ROUTE 103 JUNCTION AND ON ROUTE 103 FROM ROUTE 47 JUNCTION TO ANAHEIM STREET OVERHEAD
Contractor Name: M C M CONSTRUCTION INC
Contractor Address: P O BOX 620, NORTH HIGHLANDS, CA 95660
Resident Engineer: Daniel Leon Structure Rep.: Andy Chen

Sample Information

DIME Sample ID: 2016-06-07-16
TL Number from the TL Form: 194207A
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 06/07/2016
Date that the sample was received by the laboratory/organization performing the testing: 07/11/2016
The quantity of what the sample constitutes: 4
A brief description of the sample: 6x12
From where was the sample collected: Job Site
Laboratory sample identification: 816-07A
Structure unique identifier: STAGE 3 FRAME 1 STEM AND SOFFIT SPANS 3 4 5
Structure name: SCHYULER HEIM BRIDGE
The fabricator/manufacturer/facility name: NATIONAL READY MIX

Material Information

The concrete mix design number: S75099R1
The truck number from where the sample was collected: 435
The batch plant ticket number from where the sample was collected: 183304
Concrete batch plant: Unknown
The fabricator/manufacturer designation for the sample: Unknown
A detailed description of where the material sample was collected: CHUTE
Where the material sample would have been placed if not sampled: STAGE 3 FRAME 1 STEM AND SOFFIT SPANS 3 4 5
From Lot No.: Unknown
Bag Lot No.: Unknown

Test Results