Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 214486 DEA: 080K1224 EFIS: 0815000244
QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-15-R28.6/37.5
Work Description: REHBILIATATE EXISTING MAINLINE AND RAMP PAVEMENT
Location Description: SAN BERNARDINO COUNTY IN HESPERIA AND VICTORVILLE FROM OAK HILL ROAD OVERCROSSING TO 0.1 MILE SOUTH OF BEAR VALLEY ROAD OVERCROSSING
Contractor Name: SULLY - MILLER CONTRACTING COMPANY
Contractor Address: 135 S STATE COLLEGE BLVD. 400, BREA, CA 92821
Resident Engineer: Larry J Canuti Structure Rep.: Taghreed Al-khateeb
DIME Sample ID: 2023-12-08-29
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Barstow Field Laboratory 1
Sample Organization Contact: (760) 252-9216
Type of Sample: Quality Assurance
Type of Material: Hot Mix Asphalt
Sample Taken Date: 12/08/2023
Date that the sample was received by the laboratory/organization performing the testing: 12/08/2023
The quantity of what the sample constitutes: 1 bag
A brief description of the sample: Cold Feed 3/4" AC Aggregate
From where was the sample collected: Fabricator
Laboratory sample identification: test 1 AT0230pM 300 TONS OUT
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Sully Miller
DIME Test ID: 2023-12-08-29-1
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 12/18/2023
Date Tested: 12/11/2023
Submitted By Organization: CT D08 - Barstow Field Laboratory 1
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: kaushalkumar.talati@dot.ca.gov
Organization Phone: (951) 840-8328
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is an aggregate correction factor used?
|
No
|
Cumulative percent passing the 2 in. sieve
|
0 %
|
Cumulative percent passing the 1 1/2 in. sieve
|
0 %
|
Cumulative percent passing the 1 in. sieve
|
100 %
|
Cumulative percent passing the 3/4 in. sieve
|
99 %
|
Cumulative percent passing the 1/2 in. sieve
|
90 %
|
Cumulative percent passing the 3/8 in. sieve
|
82 %
|
Cumulative percent passing the #4 sieve
|
60 %
|
Cumulative percent passing the #8 sieve
|
50 %
|
Cumulative percent passing the #16 sieve
|
37 %
|
Cumulative percent passing the #30 sieve
|
25 %
|
Cumulative percent passing the #50 sieve
|
15 %
|
Cumulative percent passing the #100 sieve
|
8 %
|
Cumulative percent passing the #200 sieve
|
5.0 %
|