Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 214135 DEA: 09213404 EFIS: 0900000030
QA Service Level: 1
DIST-CO-RTE-PM: 09-INY-395-29.9/41.8
Work Description: ROADWAY EXCAVATION, PLACE HMA (TYPE A), AND ALTERNATIVE PIPE CULVERT.
Location Description: INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE
Contractor Name: FISHER SAND & GRAVEL CO.
Contractor Address: 1302 W DRIVERS WAY, TEPE, AZ. 85284
Resident Engineer: Kris Raber Structure Rep.: Sheila Reyes
DIME Sample ID: 2023-10-26-10
TL Number from the TL Form:
Sample Submitted By Organization: CT D09 - Bishop Field Laboratory
Sample Organization Contact: (760) 872-5211
Type of Sample: Department Acceptance
Type of Material: Hot Mix Asphalt
Sample Taken Date: 10/26/2023
Date that the sample was received by the laboratory/organization performing the testing: 10/27/2023
The quantity of what the sample constitutes: 1 Box of HMA
A brief description of the sample: 3/4 HMA WMA R25
From where was the sample collected: Job Site
Laboratory sample identification: HMA-R59
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Fisher Sand and Gravel
DIME Test ID: 2023-10-26-10-1
Test Method: AASHTO T209-22: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity)
Verified Date: 10/27/2023
Date Tested: 10/27/2023
Submitted By Organization: CT D09 - Bishop Field Laboratory
Organization Address: 500 South Main Street,
Organization City: Bishop
Organization State: CA
Organization Zipcode: 93514
Organization Email: chris.talbot@dot.ca.gov
Organization Phone: (760) 872-0794
General Comments for this Test: HMA-R59
Test Result Compliance: complies
Additional Comments When Verified:
Number of Samples
|
1
|
What is the unit of measurement for theoretical density?
|
US Units
|
Mass Determination
|
Air
|
Method Performed
|
Mechanical Agitation - Method A
|
Mass of container filled with water 1
|
7310.5 grams
|
Mass of oven-dry sample in air for Sample 1
|
2484.6 grams
|
Mass of container filled with the sample and water for Sample 1
|
8798.5 grams
|
Temperature of Water
|
77.1 °F
|
Specific Gravity for Sample 1
|
2.493
|
Theoretical maximum density at 25°C (77°F)
|
155.2 lb/ft^3
|
DIME Test ID: 2023-10-26-10-2
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 10/27/2023
Date Tested: 10/27/2023
Submitted By Organization: CT D09 - Bishop Field Laboratory
Organization Address: 500 South Main Street,
Organization City: Bishop
Organization State: CA
Organization Zipcode: 93514
Organization Email: chris.talbot@dot.ca.gov
Organization Phone: (760) 872-0794
General Comments for this Test: HMA-R59
Test Result Compliance: complies
Additional Comments When Verified:
What temperature unit is used?
|
Celsius
|
Test procedure used?
|
Method A
|
Mass of the specimen basket assembly
|
4250.3 g
|
Mass of the specimen and specimen basket assembly prior to ignition
|
6424.8 g
|
Mass of HMA Sample prior to ignition
|
2174.5 g
|
Corrected Asphalt Binder Content
|
4.63 %
|
Mass Loss
|
104.3 g
|
Mass of aggregate remaining after ignition
|
2070.2 g
|
Correction Factor (Percent by mass of HMA Specimen)
|
0.17 %
|
Moisture Content
|
0.00 %
|
Temperature Compensation Factor
|
0.00 %
|
Test Temperature
|
538 C
|