Sample Record for 2023-09-02-8
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 215396 DEA: 042K8404 EFIS: 0417000031
QA Service Level: 1
DIST-CO-RTE-PM: 04-SOL-29,80-0.0,0.8/1.6
Work Description: HMA, STRUCTURAL CONCRETE, CIDH PILING AND REBAR.
Location Description: SOLANO COUNTY IN VALLEJO AT ROUTE 80/29 SEPARATION AND ON ROUTE 80 FROM 0.2 MILE NORTH OF CARQUINEZ BRIDGE TOLL PLAZA TO 0.3 MILE SOUTH OF MAGAZINE STREET OVERCROSSING
Contractor Name: OC Jones & Sons Inc
Contractor Address: 1520 4th Street, Berkeley, CA 94710
Resident Engineer: Noel Aquino Structure Rep.: Angelo Perez
Sample Information
DIME Sample ID: 2023-09-02-8
TL Number from the TL Form:
Sample Submitted By Organization: CT D04 - Concord Field Laboratory
Sample Organization Contact: (510) 714-7019
Type of Sample: Quality Assurance
Type of Material: Aggregate
Sample Taken Date: 09/02/2023
Date that the sample was received by the laboratory/organization performing the testing: 09/02/2023
The quantity of what the sample constitutes: LOT 1 SUBLOT 2
A brief description of the sample: 1/2-INCH RHMA-O PG 64-16
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Vulcan Vallejo Batch Plant
Material Information
Source Identification (SMARA, name of Pit or Job Site): 91-48-0002
The fabricator's/manufacturer's product name for the sample:
The fabricator/manufacturer designation for the sample:
The plant number:
A detailed description of where the material sample was collected: Sample Pickup From Plant
Where the material sample would have been placed if not sampled:
Primary Aggregate Nominal Size: 1/2 inch
The concrete mix design number:
Lot number: 1
Sublot number: 2
Aggregate Mix Number: 326127
Test Results
Test 1 of 1
DIME Test ID: 2023-09-02-8-1
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Verified Date: 10/25/2023
Date Tested: 09/02/2023
Submitted By Organization: CT D04 - Concord Field Laboratory
Organization Address: 2525 Stanwell Drive, Suite 100,
Organization City: Concord
Organization State: CA
Organization Zipcode: 94520
Organization Email: gurind.joshi@dot.ca.gov
Organization Phone: (510) 714-7019
General Comments for this Test: LOT 1 SUBLOT 2
Vulcan Vallejo Drier Drum Plant
Test PASSED
MIX I.D. 326127
Test Result Compliance: complies
Additional Comments When Verified:
What type of gradation is being tested?
|
Combined Gradation
|
Cumulative percent passing the 2 in. sieve
|
0 %
|
Cumulative percent passing the 1 1/2 in. sieve
|
0 %
|
Cumulative percent passing the 1 in. sieve
|
100 %
|
Cumulative percent passing the 3/4 in. sieve
|
100 %
|
Cumulative percent passing the 1/2 in. sieve
|
99 %
|
Cumulative percent passing the 3/8 in. sieve
|
89 %
|
Cumulative percent passing the #4 sieve
|
32 %
|
Cumulative percent passing the #8 sieve
|
13 %
|
Cumulative percent passing the #16 sieve
|
6 %
|
Cumulative percent passing the #30 sieve
|
3 %
|
Cumulative percent passing the #50 sieve
|
2 %
|
Cumulative percent passing the #100 sieve
|
1 %
|
Cumulative percent passing the #200 sieve
|
1.2 %
|