Print Report | Back to Sample Detail

Sample Record for 2023-08-31-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 994326 DEA: 051C3604 EFIS: 0512000134 QA Service Level: 1
DIST-CO-RTE-PM: 05-SB-217-0.9/1.4
Work Description: REPLACE BRIDGE.
Location Description: SANTA BARBARA COUNTY NEAR GOLETA FROM 0.2 MILE EAST OF GOLETA SLOUGH BRIDGE TO 0.4 MILE EAST OF SAN JOSE CREEK BRIDGE
Contractor Name: MCM CONSTRUCTION
Contractor Address: 6413 32nd Street, North Highlands, Ca 95660
Resident Engineer: Manny Yogarajah Structure Rep.: Alis Chhay

Sample Information

DIME Sample ID: 2023-08-31-1
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 08/31/2023
Date that the sample was received by the laboratory/organization performing the testing: 09/01/2023
The quantity of what the sample constitutes: 1500 lots 7-16
A brief description of the sample: #6 x 2'-6" dia. hoops
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: RKR Steel Welding

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 221422
Hoop Manufacturer Lot Number(s): 11 and 16
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: #6
Diameter of Hoop: 2'-6"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Cascade Steel Oregon
Welding Company: RKR Steel Welding
Coating Standards: Uncoated
Weld Type: Flash Welded

Test Results