Print Report | Back to Sample Detail

Sample Record for 2023-08-15-60

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 993338 DEA: 010H8104 EFIS: 0118000111 QA Service Level: 1
DIST-CO-RTE-PM: 01-MEN-101-1.5/2
Work Description: COMMINSKY PERMANENT RESTORATION
Location Description: MENDOCINO COUNTY NEAR HOPLAND FROM 0.7 MILE TO 1.3 MILES NORTH OF GEYSERS ROAD
Contractor Name: Ghilotti Construction Company
Contractor Address: 246 Ghilotti Ave, Santa Rosa, CA 95407
Resident Engineer: Steve Tisell Structure Rep.: Mostafa Bayoumi

Sample Information

DIME Sample ID: 2023-08-15-60
TL Number from the TL Form: 899679
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Acceptance
Type of Material: Asphalt Binder
Sample Taken Date: 08/15/2023
Date that the sample was received by the laboratory/organization performing the testing: 08/24/2023
The quantity of what the sample constitutes: 1 of 1
A brief description of the sample: pg 58-22
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Ghilotti Const

Material Information

Performance Grade: PG 58-22
Modified:
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: Valero Marketing & Supply - Benicia CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:

Test Results

Test 1 of 1

DIME Test ID: 2023-08-15-60-1
Test Method: AASHTO T315-22: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 08/31/2023
Date Tested: 08/31/2023
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: OG
Test Result Compliance: complies
Additional Comments When Verified:
Phase Original binder
Test Gap 1 mm
Test Frequency 10.0 rad/s
Strain Amplitude 12.00 %
Stress Amplitude 0.187 kPa
Phase Angle (δ) (for the 10 cycles) 84.5 degree
Complex Modulus (G*) (for the 10 measurements) 1.554 kPa
Test Temperature (Specimen 1) 58.0 C
Dynamic Shear, G*/sin(δ) 1.56 kPa