Print Report | Back to Sample Detail

Sample Record for 2023-07-26-80

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 215753 DEA: 050N72U4 EFIS: 0520000169 QA Service Level: 1
DIST-CO-RTE-PM: 05-SB-101-4.4/R7.7
Work Description: Please cc Office Engineer Ni Nyoman Paul on reports sent to RE and SR. Construct High Occupancy Vehicle (HOV) lanes on U.S. Route 101 and rehabilitation - Segment 4B.
Location Description: 101 freeway in Summerland, CA
Contractor Name: GRANITE CONSTRUCTION COMPANY
Contractor Address: 5335 Debbie Road, Santa Barbara, CA 93111
Resident Engineer: Luobao Cai Structure Rep.: Emiliano Berntsen

Sample Information

DIME Sample ID: 2023-07-26-80
TL Number from the TL Form:
Sample Submitted By Organization: CT D05 - Carpinteria Field Laboratory
Sample Organization Contact: (805) 621-3616
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 07/26/2023
Date that the sample was received by the laboratory/organization performing the testing: 07/26/2023
The quantity of what the sample constitutes: 3.47cy
A brief description of the sample: Concrete Test Samples
From where was the sample collected: Supplier
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Cal Portland Lompoc

Material Information

The concrete mix design number: 710RH1010S
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: 1883974
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Discharge from concrete truck into wheelbarrow.
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results

Test 1 of 2

DIME Test ID: 2023-07-26-80-1
Test Method: ASTM C1064-17: Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
Verified Date: 08/21/2023
Date Tested: 07/26/2023
Submitted By Organization: CT D05 - Carpinteria Field Laboratory
Organization Address: 21 Griffin Road North,
Organization City: Windsor
Organization State: CT
Organization Zipcode: 06095-1590
Organization Email: dlachaine@trccompanies.com
Organization Phone: (805) 621-3616
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Temperature 79 F

Test 2 of 2

DIME Test ID: 2023-07-26-80-2
Test Method: ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement Concrete
Verified Date: 08/21/2023
Date Tested: 07/26/2023
Submitted By Organization: CT D05 - Carpinteria Field Laboratory
Organization Address: 21 Griffin Road North,
Organization City: Windsor
Organization State: CT
Organization Zipcode: 06095-1590
Organization Email: dlachaine@trccompanies.com
Organization Phone: (805) 621-3616
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Slump 4.25 inch