Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 213749 DEA: 120C1104 EFIS: 1200000633
QA Service Level: 1
DIST-CO-RTE-PM: 12-ORA-57-20.3/21.6
Work Description: SR-57 Lambert Interchange Project: WIDEN BRIDGES AND CONSTRUCT RW, SW, HMA, JPCP AND ELECTRICAL SYSTEMS.
Location Description: ORANGE COUNTY IN BREA FROM 0.6 MILE SOUTH TO 0.7 MILE NORTH OF LAMBERT ROAD UNDERCROSSING
Contractor Name: SECURITY PAVING COMPANY, INC.
Contractor Address: 13170 TELFAIR AVENUE, SYLMAR, CA 91342
Resident Engineer: Steven Kim Structure Rep.: Theodore Pham
DIME Sample ID: 2023-08-03-71
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Production Start-Up
Type of Material: Asphalt Binder
Sample Taken Date: 08/03/2023
Date that the sample was received by the laboratory/organization performing the testing: 08/07/2023
The quantity of what the sample constitutes: 1 Quart Can
A brief description of the sample: PG Asphalt Binder
From where was the sample collected: Supplier
Laboratory sample identification: 0400-23
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Vulcan - Corona Drum
Performance Grade: PG 64-16
Modified: No
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: San Joaquin Refinery - Bakersfield CA
Multigrade: Yes
Multigrade Type: PG 64-16 / PG 64-10
Asphalt Binder Mix Number:
DIME Test ID: 2023-08-03-71-1
Test Method: AASHTO T228-22: Standard Method of Test for Specific Gravity of Semi-Solid Asphalt Materials (Specific Gravity)
Verified Date: 08/21/2023
Date Tested: 08/14/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
DIME Test ID: 2023-08-03-71-2
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Verified Date: 08/21/2023
Date Tested: 08/14/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test: - 0.193 + 0.006 = - 0.187
Test Result Compliance: complies
Additional Comments When Verified:
Is mass change based on one or two containers?
|
Two
|
Any material loss from containers during heating process/testing?
|
No
|
Mass of empty container #1
|
172.801 grams
|
Mass of empty container #2
|
172.871 grams
|
Mass of container #1 before test (m1i)
|
207.906 grams
|
Mass of container #2 before test (m2i)
|
207.867 grams
|
Mass of container #1 after test (m1f)
|
207.838 grams
|
Mass of container #2 after test (m2f)
|
207.800 grams
|
Average mass change
|
-0.193 percent
|
DIME Test ID: 2023-08-03-71-3
Test Method: AASHTO T315-12: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 08/21/2023
Date Tested: 08/14/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
Original binder
|
Phase Angle (δ) (for the 10 cycles)
|
89.6 degree
|
Dynamic Shear, G*/sin(δ)
|
1.41 kPa
|
(G*) x sin(δ)=
|
no data
|
DIME Test ID: 2023-08-03-71-4
Test Method: AASHTO T315-16: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 08/21/2023
Date Tested: 08/14/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
RTFO residue
|
Test Plate Diameter
|
25 mm
|
Phase Angle (δ) (for the 10 cycles)
|
89.0 degree
|
Dynamic Shear, G*/sin(δ)
|
2.54 kPa
|
DIME Test ID: 2023-08-03-71-5
Test Method: AASHTO T316-17: Standard Method of Test for Viscosity Determination of Asphalt Binder Using Rotational Viscometer
Verified Date: 08/21/2023
Date Tested: 08/14/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is viscosity reading in cP/Pa-s?
|
Pa-s
|
Time of test
|
7:06 HH:MM
|
Test Temperature
|
135 C
|
Speed
|
100 rpm
|
Spindle size
|
21 in
|
Torque
|
50 %
|
Viscosity reading #1 (A)
|
0.251 Pa-s
|
Viscosity reading #2 (B)
|
0.25 Pa-s
|
Viscosity reading #3 (C)
|
0.252 Pa-s
|
Average viscosity
|
0.251 Pa-s
|
DIME Test ID: 2023-08-03-71-6
Test Method: AASHTO T44-18: Standard Method of Test for Solubility of Bituminous Materials
Verified Date: 08/21/2023
Date Tested: 08/14/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Was test performed on residue from distillation or evaporation?
|
Distillation
|
Soluble, percent
|
99.9 %
|
Insoluble, percent
|
0.1 %
|
DIME Test ID: 2023-08-03-71-7
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Verified Date: 08/24/2023
Date Tested: 08/22/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is a normal test obtainable?
|
Yes
|
Number of replicates tested
|
One
|
Ductility of test #1 (D1)
|
75 cm
|
Ductility of sample
|
75 cm
|
DIME Test ID: 2023-08-03-71-8
Test Method: AASHTO T315-22: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 09/10/2023
Date Tested: 08/29/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test: Failed at 28 degrees, retested at 31 degrees per section 92
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
PAV residue
|
Test Plate Diameter
|
8 mm
|
Phase Angle (δ) (for the 10 cycles)
|
66.1 degree
|
(G*) x sin(δ)=
|
2970 kPa
|
DIME Test ID: 2023-08-03-71-9
Test Method: AASHTO T313-22: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 09/10/2023
Date Tested: 08/29/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: does not comply
Additional Comments When Verified:
Time test started
|
no data HH:MM:SS
|
Flags issued by software during test
|
no data
|
Correlation coefficient (R²)
|
0
|
Regression coefficient a
|
no data
|
Regression coefficient b
|
no data
|
Regression coefficient c
|
no data
|
Load at time 0.0
|
0.0 mN
|
Deflection at time 0.0 s
|
0.000 µm
|
Load at time 0.5 s
|
0.0 mN
|
Deflection at time 0.5 s
|
0.000 µm
|
Load at 60.0 s
|
0.0 mN
|
Beam deflection 60.0 s
|
0.000 µm
|
Measured Stiffness Modulus 60.0 s
|
447.000 mPa
|
Estimated Stiffness Modulus 60.0 s
|
no data
|
Difference between stiffness moduli 60.0 s
|
no data
|
Estimated m-value 60.0 s
|
0.308
|