Print Report | Back to Sample Detail

Sample Record for 2023-08-03-71

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 213749 DEA: 120C1104 EFIS: 1200000633 QA Service Level: 1
DIST-CO-RTE-PM: 12-ORA-57-20.3/21.6
Work Description: SR-57 Lambert Interchange Project: WIDEN BRIDGES AND CONSTRUCT RW, SW, HMA, JPCP AND ELECTRICAL SYSTEMS.
Location Description: ORANGE COUNTY IN BREA FROM 0.6 MILE SOUTH TO 0.7 MILE NORTH OF LAMBERT ROAD UNDERCROSSING
Contractor Name: SECURITY PAVING COMPANY, INC.
Contractor Address: 13170 TELFAIR AVENUE, SYLMAR, CA 91342
Resident Engineer: Steven Kim Structure Rep.: Theodore Pham

Sample Information

DIME Sample ID: 2023-08-03-71
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Production Start-Up
Type of Material: Asphalt Binder
Sample Taken Date: 08/03/2023
Date that the sample was received by the laboratory/organization performing the testing: 08/07/2023
The quantity of what the sample constitutes: 1 Quart Can
A brief description of the sample: PG Asphalt Binder
From where was the sample collected: Supplier
Laboratory sample identification: 0400-23
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Vulcan - Corona Drum

Material Information

Performance Grade: PG 64-16
Modified: No
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: San Joaquin Refinery - Bakersfield CA
Multigrade: Yes
Multigrade Type: PG 64-16 / PG 64-10
Asphalt Binder Mix Number:

Test Results

Test 1 of 9

DIME Test ID: 2023-08-03-71-1
Test Method: AASHTO T228-22: Standard Method of Test for Specific Gravity of Semi-Solid Asphalt Materials (Specific Gravity)
Verified Date: 08/21/2023
Date Tested: 08/14/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Specific Gravity 1.022

Test 2 of 9

DIME Test ID: 2023-08-03-71-2
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Verified Date: 08/21/2023
Date Tested: 08/14/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test: - 0.193 + 0.006 = - 0.187
Test Result Compliance: complies
Additional Comments When Verified:
Is mass change based on one or two containers? Two
Any material loss from containers during heating process/testing? No
Mass of empty container #1 172.801 grams
Mass of empty container #2 172.871 grams
Mass of container #1 before test (m1i) 207.906 grams
Mass of container #2 before test (m2i) 207.867 grams
Mass of container #1 after test (m1f) 207.838 grams
Mass of container #2 after test (m2f) 207.800 grams
Average mass change -0.193 percent

Test 3 of 9

DIME Test ID: 2023-08-03-71-3
Test Method: AASHTO T315-12: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 08/21/2023
Date Tested: 08/14/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase Original binder
Phase Angle (δ) (for the 10 cycles) 89.6 degree
Dynamic Shear, G*/sin(δ) 1.41 kPa
(G*) x sin(δ)= no data

Test 4 of 9

DIME Test ID: 2023-08-03-71-4
Test Method: AASHTO T315-16: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 08/21/2023
Date Tested: 08/14/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase RTFO residue
Test Plate Diameter 25 mm
Phase Angle (δ) (for the 10 cycles) 89.0 degree
Dynamic Shear, G*/sin(δ) 2.54 kPa

Test 5 of 9

DIME Test ID: 2023-08-03-71-5
Test Method: AASHTO T316-17: Standard Method of Test for Viscosity Determination of Asphalt Binder Using Rotational Viscometer
Verified Date: 08/21/2023
Date Tested: 08/14/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is viscosity reading in cP/Pa-s? Pa-s
Time of test 7:06 HH:MM
Test Temperature 135 C
Speed 100 rpm
Spindle size 21 in
Torque 50 %
Viscosity reading #1 (A) 0.251 Pa-s
Viscosity reading #2 (B) 0.25 Pa-s
Viscosity reading #3 (C) 0.252 Pa-s
Average viscosity 0.251 Pa-s

Test 6 of 9

DIME Test ID: 2023-08-03-71-6
Test Method: AASHTO T44-18: Standard Method of Test for Solubility of Bituminous Materials
Verified Date: 08/21/2023
Date Tested: 08/14/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Was test performed on residue from distillation or evaporation? Distillation
Soluble, percent 99.9 %
Insoluble, percent 0.1 %

Test 7 of 9

DIME Test ID: 2023-08-03-71-7
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Verified Date: 08/24/2023
Date Tested: 08/22/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is a normal test obtainable? Yes
Number of replicates tested One
Ductility of test #1 (D1) 75 cm
Ductility of sample 75 cm

Test 8 of 9

DIME Test ID: 2023-08-03-71-8
Test Method: AASHTO T315-22: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 09/10/2023
Date Tested: 08/29/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test: Failed at 28 degrees, retested at 31 degrees per section 92
Test Result Compliance: complies
Additional Comments When Verified:
Phase PAV residue
Test Plate Diameter 8 mm
Phase Angle (δ) (for the 10 cycles) 66.1 degree
(G*) x sin(δ)= 2970 kPa

Test 9 of 9

DIME Test ID: 2023-08-03-71-9
Test Method: AASHTO T313-22: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 09/10/2023
Date Tested: 08/29/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: does not comply
Additional Comments When Verified:
Time test started no data HH:MM:SS
Flags issued by software during test no data
Correlation coefficient (R²) 0
Regression coefficient a no data
Regression coefficient b no data
Regression coefficient c no data
Load at time 0.0 0.0 mN
Deflection at time 0.0 s 0.000 µm
Load at time 0.5 s 0.0 mN
Deflection at time 0.5 s 0.000 µm
Load at 60.0 s 0.0 mN
Beam deflection 60.0 s 0.000 µm
Measured Stiffness Modulus 60.0 s 447.000 mPa
Estimated Stiffness Modulus 60.0 s no data
Difference between stiffness moduli 60.0 s no data
Estimated m-value 60.0 s 0.308