Print Report | Back to Sample Detail

Sample Record for 2023-08-10-36

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 215744 DEA: 033H93U4 EFIS: 0321000091 QA Service Level: 1
DIST-CO-RTE-PM: 03-YUB,BUT-70-25.5/25.8,0.0/3.8
Work Description: WIDEN ROADWAY & SHOULDER, ADD TURN LANES & CONSTRUCT BRIDGE.
Location Description: YUBA AND BUTTE COUNTIES ABOUT 11 MILES NORTH OF MARYSVILLE FROM 0.8 MILE NORTH OF CHANDLER ROAD TO 0.2 MILE SOUTH OF EAST GRIDLEY ROAD
Contractor Name: Teichert Construction & MCM JV
Contractor Address: 4401 Duluth Ave, Rocklin, CA 95766
Resident Engineer: Anthony Granados Structure Rep.: Matt Crete

Sample Information

DIME Sample ID: 2023-08-10-36
TL Number from the TL Form:
Sample Submitted By Organization: CT D03 - Chico Field Laboratory
Sample Organization Contact: (916) 799-4305
Type of Sample: Quality Assurance
Type of Material: Hot Mix Asphalt
Sample Taken Date: 08/10/2023
Date that the sample was received by the laboratory/organization performing the testing: 08/11/2023
The quantity of what the sample constitutes: 8 Boxes
A brief description of the sample: three quarter inch HMA Type A
From where was the sample collected: Supplier
Laboratory sample identification:
Structure unique identifier:
Structure name: HWY 70- Three Bridges
The fabricator/manufacturer/facility name: Teichert Materials Hallwood

Material Information

HMA Type: Type A HMA
HMA Grading: 3/4 inch
Lot number: 6
Sublot number: 14
HMA Mix Number: 30940432407V

Test Results