Print Report | Back to Sample Detail

Sample Record for 2023-08-01-6

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 212720 DEA: 07291404 EFIS: 0712000094 QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-1-55-58
Work Description: TRANCAS CREEK BRIDGE REPLACEMENT
Location Description: IN LOS ANGELES IN CITY OF MALIBU AT TRANCAS CREEK BRIDGE (53-0027).
Contractor Name: STACY AND WITBECK, INC.
Contractor Address: 3939 Atlantic Ave Suite 114, Long Beach, CA 90807
Resident Engineer: Dan Leon Structure Rep.: Frank Lofti

Sample Information

DIME Sample ID: 2023-08-01-6
TL Number from the TL Form:
Sample Submitted By Organization: CT D07 - Materials Field Laboratory, Unit 1953
Sample Organization Contact: (213) 817-0387
Type of Sample: Department Acceptance
Type of Material: Soil
Sample Taken Date: 08/01/2023
Date that the sample was received by the laboratory/organization performing the testing: 08/01/2023
The quantity of what the sample constitutes: 3500 SF
A brief description of the sample: Class 3 Aggregate Base
From where was the sample collected: Job Site
Laboratory sample identification: 23-1179
Structure unique identifier:
Structure name: Trancas Creek Bridge
The fabricator/manufacturer/facility name: NA

Material Information

The fabricator's/manufacturer's product name for the sample: Aggregate Base
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Various locations
Where the material sample would have been placed if not sampled:

Test Results

Test 1 of 2

DIME Test ID: 2023-08-01-6-1
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Verified Date: 08/01/2023
Date Tested: 08/01/2023
Submitted By Organization: CT D07 - Materials Field Laboratory, Unit 1953
Organization Address: 1940 South Workman Mill Road,
Organization City: Whittier
Organization State: CA
Organization Zipcode: 90601
Organization Email: chad.chotibhongs@dot.ca.gov
Organization Phone: (213) 817-0387
General Comments for this Test: NB SR-1 in Malibu Trancas Canyon Creek Bridge New roadway by Abutment 1
Test Result Compliance:
Additional Comments When Verified:
Standard Count Density 2334 g/cc
Count or Density 1 2 g/cc
Count or Density 2 2.09 g/cc
Count or Density 3 2.02 g/cc
Standard Count Moisture 654 g/cc
Moisture Count 1 0.18 g/cc
Moisture Count 2 0.21 g/cc
Moisture Count 3 0.17 g/cc
Sum of Count or Density 6.11 g/cc
Average of Count or Density 2.04 g/cc
Sum of Moisture Count 0.56 g/cc
Average of Moisture Count 0.19 g/cc
Calculated Percent Relative Compaction 97 %
Reported Percent Relative Compaction 97 %

Test 2 of 2

DIME Test ID: 2023-08-01-6-2
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Verified Date: 08/01/2023
Date Tested: 08/01/2023
Submitted By Organization: CT D07 - Materials Field Laboratory, Unit 1953
Organization Address: 1940 South Workman Mill Road,
Organization City: Whittier
Organization State: CA
Organization Zipcode: 90601
Organization Email: chad.chotibhongs@dot.ca.gov
Organization Phone: (213) 817-0387
General Comments for this Test: NB SR-1 in Malibu Trancas Canyon Creek Bridge New roadway by Abutment 1
Test Result Compliance:
Additional Comments When Verified:
Is oversize material No
In-place wet density 2.04
Highest adjust wet density 2.1
Relative compaction 97
% Moisture 10.1 %
Optimum Moisture no data