Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 994345 DEA: 023J7804 EFIS: 0222000083
QA Service Level: 1
DIST-CO-RTE-PM: 02-TRI-36-15.8/16.9,20.5/24.5
Work Description: PLACE HOT MIX ASPHALT (TYPE A) AND REPLACE ASPHALT CONCRETE SURFACING.
Location Description: TRINITY COUNTY NEAR FOREST GLEN FROM 1.1 MILES WEST OF SOUTH FORK TRINITY RIVER BRIDGE TO SOUTH FORK TRINITY RIVER BRIDGE NO. 05-0026 AND FROM UPPER RATTLESNAKE CREEK BRIDGE NO. 05-0073 TO 0.3 MILE WEST OF TRINITY PINES ROAD
Contractor Name: TULLIS INC.
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown
DIME Sample ID: 2023-06-14-83
TL Number from the TL Form: 852758
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Department Acceptance
Type of Material: Asphalt Binder
Sample Taken Date: 06/14/2023
Date that the sample was received by the laboratory/organization performing the testing: 07/25/2023
The quantity of what the sample constitutes: 1 Can
A brief description of the sample: PG 58-34 M (Valero - Benicia)
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Tullis Inc. - Northstate Asphalt (Redding CA)
Performance Grade: PG 58-34 M
Modified: Yes
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: Valero Marketing & Supply - Benicia CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:
DIME Test ID: 2023-06-14-83-1
Test Method: AASHTO T315-22: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 08/09/2023
Date Tested: 08/04/2023
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: OG
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
Original binder
|
Test Gap
|
1 mm
|
Test Frequency
|
10.0 rad/s
|
Strain Amplitude
|
12.06 %
|
Stress Amplitude
|
0.286 kPa
|
Phase Angle (δ) (for the 10 cycles)
|
66.1 degree
|
Complex Modulus (G*) (for the 10 measurements)
|
2.368 kPa
|
Test Temperature (Specimen 1)
|
58.0 C
|
Dynamic Shear, G*/sin(δ)
|
2.59 kPa
|
DIME Test ID: 2023-06-14-83-2
Test Method: AASHTO T315-22: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 08/09/2023
Date Tested: 08/04/2023
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: RTFO
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
RTFO residue
|
Test Gap
|
1 mm
|
Test Frequency
|
10.0 rad/s
|
Strain Amplitude
|
10.05 %
|
Stress Amplitude
|
0.736 kPa
|
Phase Angle (δ) (for the 10 cycles)
|
59.3 degree
|
Complex Modulus (G*) (for the 10 measurements)
|
7.325 kPa
|
Test Temperature (Specimen 1)
|
58.0 C
|
Dynamic Shear, G*/sin(δ)
|
8.52 kPa
|
DIME Test ID: 2023-06-14-83-3
Test Method: AASHTO T315-22: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 08/09/2023
Date Tested: 08/08/2023
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: PAV
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
PAV residue
|
Test Plate Diameter
|
8 mm
|
Test Gap
|
2 mm
|
Test Frequency
|
10.0 rad/s
|
Strain Amplitude
|
1.01 %
|
Stress Amplitude
|
35.430 kPa
|
Phase Angle (δ) (for the 10 cycles)
|
39.4 degree
|
Complex Modulus (G*) (for the 10 measurements)
|
3525.241 kPa
|
Test Temperature (Specimen 1)
|
16.0 C
|
(G*) x sin(δ)=
|
2238 kPa
|
DIME Test ID: 2023-06-14-83-4
Test Method: AASHTO T313-22: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 08/09/2023
Date Tested: 08/08/2023
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: BBR
Test Result Compliance: complies
Additional Comments When Verified:
Minimum test bath temperature at 240 s
|
-24.1 C
|
Maximum test bath temperature at 240 s
|
-23.9 C
|
Time of test load application
|
no data HH:MM:SS
|
File name of test data
|
no data
|
Time beam in bath
|
no data
|
Time test started
|
no data HH:MM:SS
|
Flags issued by software during test
|
no data
|
Correlation coefficient (R²)
|
0
|
Regression coefficient a
|
no data
|
Regression coefficient b
|
no data
|
Regression coefficient c
|
no data
|
Load at time 0.0
|
0.0 mN
|
Deflection at time 0.0 s
|
0.000 µm
|
Load at time 0.5 s
|
0.0 mN
|
Deflection at time 0.5 s
|
0.000 µm
|
Load at 60.0 s
|
936.0 mN
|
Beam deflection 60.0 s
|
0.892 µm
|
Measured Stiffness Modulus 60.0 s
|
84.600 mPa
|
Estimated Stiffness Modulus 60.0 s
|
84.500 mPa
|
Difference between stiffness moduli 60.0 s
|
-0.12 %
|
Estimated m-value 60.0 s
|
0.313
|
DIME Test ID: 2023-06-14-83-5
Test Method: AASHTO T301-22: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Verified Date: 08/09/2023
Date Tested: 08/07/2023
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: ER
Test Result Compliance: complies
Additional Comments When Verified:
Final Reading from the testing machine (X)
|
5 cm
|
% Elongation Recovery
|
75 %
|