Print Report | Back to Sample Detail

Sample Record for 2023-06-20-59

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 215814 DEA: 023H3204 EFIS: 0217000097 QA Service Level: 1
DIST-CO-RTE-PM: 02-SIS-5-2.7/R15.9
Work Description: Dunsmuir GAP - Pavement Rehabilitation.
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2023-06-20-59
TL Number from the TL Form: 852765
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Acceptance
Type of Material: Asphalt Binder
Sample Taken Date: 06/20/2023
Date that the sample was received by the laboratory/organization performing the testing: 07/25/2023
The quantity of what the sample constitutes: 1 Can
A brief description of the sample: PG 58-34 M (Valero - Benicia)
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Tullis Inc. - Northstate Asphalt (Redding CA)

Material Information

Performance Grade: PG 58-34 M
Modified: Yes
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: Valero Marketing & Supply - Benicia CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:

Test Results

Test 1 of 5

DIME Test ID: 2023-06-20-59-1
Test Method: AASHTO T315-22: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 08/09/2023
Date Tested: 08/04/2023
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: OG
Test Result Compliance: complies
Additional Comments When Verified:
Phase Original binder
Test Gap 1 mm
Test Frequency 10.0 rad/s
Strain Amplitude 12.06 %
Stress Amplitude 0.322 kPa
Phase Angle (δ) (for the 10 cycles) 59.9 degree
Complex Modulus (G*) (for the 10 measurements) 2.668 kPa
Test Temperature (Specimen 1) 58.0 C
Dynamic Shear, G*/sin(δ) 3.08 kPa

Test 2 of 5

DIME Test ID: 2023-06-20-59-2
Test Method: AASHTO T315-22: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 08/09/2023
Date Tested: 08/07/2023
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: RTFO
Test Result Compliance: complies
Additional Comments When Verified:
Phase RTFO residue
Test Gap 1 mm
Test Frequency 10.0 rad/s
Strain Amplitude 10.05 %
Stress Amplitude 0.715 kPa
Phase Angle (δ) (for the 10 cycles) 54.4 degree
Complex Modulus (G*) (for the 10 measurements) 7.119 kPa
Test Temperature (Specimen 1) 58.0 C
Dynamic Shear, G*/sin(δ) 8.76 kPa

Test 3 of 5

DIME Test ID: 2023-06-20-59-3
Test Method: AASHTO T315-22: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 08/09/2023
Date Tested: 08/08/2023
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: PAV
Test Result Compliance: complies
Additional Comments When Verified:
Phase PAV residue
Test Plate Diameter 8 mm
Test Gap 2 mm
Test Frequency 10.0 rad/s
Strain Amplitude 1.01 %
Stress Amplitude 25.208 kPa
Phase Angle (δ) (for the 10 cycles) 38.7 degree
Complex Modulus (G*) (for the 10 measurements) 2508.193 kPa
Test Temperature (Specimen 1) 16.0 C
(G*) x sin(δ)= 1568 kPa

Test 4 of 5

DIME Test ID: 2023-06-20-59-4
Test Method: AASHTO T313-22: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 08/09/2023
Date Tested: 08/08/2023
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: BBR
Test Result Compliance: complies
Additional Comments When Verified:
Minimum test bath temperature at 240 s -24.1 C
Maximum test bath temperature at 240 s -23.9 C
Time of test load application no data HH:MM:SS
File name of test data no data
Time beam in bath no data
Time test started no data HH:MM:SS
Flags issued by software during test no data
Correlation coefficient (R²) 0
Regression coefficient a no data
Regression coefficient b no data
Regression coefficient c no data
Load at time 0.0 0.0 mN
Deflection at time 0.0 s 0.000 µm
Load at time 0.5 s 0.0 mN
Deflection at time 0.5 s 0.000 µm
Load at 60.0 s 952.0 mN
Beam deflection 60.0 s 0.832 µm
Measured Stiffness Modulus 60.0 s 92.300 mPa
Estimated Stiffness Modulus 60.0 s 92.500 mPa
Difference between stiffness moduli 60.0 s 0.22 %
Estimated m-value 60.0 s 0.302

Test 5 of 5

DIME Test ID: 2023-06-20-59-5
Test Method: AASHTO T301-22: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Verified Date: 08/09/2023
Date Tested: 08/04/2023
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: ER
Test Result Compliance: complies
Additional Comments When Verified:
Final Reading from the testing machine (X) 3 cm
% Elongation Recovery 85 %