Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 043Y0904 Cty MRN Rte 1 PM 35.26, 35.26/35.26 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Steve Russell |
Date Reported: |
08/15/2023 |
|
Address: |
TL Number: |
200960 |
||
City: |
||||
Project Name: Repair slipout and failed culvert |
||||
Prime Contractor: Disney Construction |
||||
Sample Taken Date: |
07/18/2023 |
Mix Design: |
SL3172CE |
|
Contractor: Unknown |
Location: |
|||
Structure unique identifier: |
||||
Structure name: |
||||
Location of Pour: |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 4.00 | 12.57 | 84625 | 6734.0 | 2 |
2 | 4.01 | 12.63 | 99917 | 7912.0 | 2 |
3 | 4.02 | 12.69 | 92261 | 7269 | 2 |
DIME Test ID: 2023-07-18-35-1
Number of specimens: 3
Compressive strength (to nearest 10 psi): 7310
Age of specimen: 28 days
Certified By: Spencer Adams
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing