Sample Record for 2023-06-13-81
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 215129 DEA: 050N73U4 EFIS: 0520000166
QA Service Level: 1
DIST-CO-RTE-PM: 05-SB-101-7.3/9.6
Work Description: !!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar,
Location Description: SUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE
Contractor Name: GRANITE CONSTRUCTION COMPANY
Contractor Address: PO Box 6744, Santa Barbara , CA 93111
Resident Engineer: Luobao Cai Structure Rep.: Emiliano Berntsen
Sample Information
DIME Sample ID: 2023-06-13-81
TL Number from the TL Form:
Sample Submitted By Organization: CT D05 - Carpinteria Field Laboratory
Sample Organization Contact: (805) 621-3616
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 06/13/2023
Date that the sample was received by the laboratory/organization performing the testing: 06/13/2023
The quantity of what the sample constitutes: 3cy
A brief description of the sample: Concrete Test Samples
From where was the sample collected: Supplier
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Martin Marrieta, Goleta
Material Information
The concrete mix design number: 725A1Z0P
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: 34333584
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Discharge from concrete truck into wheelbarrow.
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:
Test Results
Test 1 of 2
DIME Test ID: 2023-06-13-81-1
Test Method: ASTM C1064-17: Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
Verified Date: 07/13/2023
Date Tested: 06/13/2023
Submitted By Organization: CT D05 - Carpinteria Field Laboratory
Organization Address: 21 Griffin Road North,
Organization City: Windsor
Organization State: CT
Organization Zipcode: 06095-1590
Organization Email: dlachaine@trccompanies.com
Organization Phone: (805) 621-3616
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Test 2 of 2
DIME Test ID: 2023-06-13-81-2
Test Method: ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement Concrete
Verified Date: 07/13/2023
Date Tested: 06/13/2023
Submitted By Organization: CT D05 - Carpinteria Field Laboratory
Organization Address: 21 Griffin Road North,
Organization City: Windsor
Organization State: CT
Organization Zipcode: 06095-1590
Organization Email: dlachaine@trccompanies.com
Organization Phone: (805) 621-3616
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified: