Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 88888 DEA: SMTL-STOCK EFIS: SMTL-STOCK
QA Service Level:
DIST-CO-RTE-PM: 59---
Work Description: Special project for SMTL stock material. Object Code: 1025. J2 DEA: 912680.
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown
DIME Sample ID: 2023-07-13-2
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Bay Area Field Office
Sample Organization Contact: (916) 284-6784
Type of Sample: Verification
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 07/13/2023
Date that the sample was received by the laboratory/organization performing the testing: 08/28/2023
The quantity of what the sample constitutes: 15
A brief description of the sample: Machine Qualification H&H S#H6182
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Conco Reinforcing Benicia
Production or Authorization Testing: Authorization Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 3500032029
Hoop Manufacturer Lot Number(s): 1
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: #7
Diameter of Hoop: 5'-6"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Nucor
Welding Company: Conco Companies Benicia
Coating Standards: Uncoated
Weld Type: Flash Welded
DIME Test ID: 2023-07-13-2-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 12/29/2023
Date Tested: 08/29/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: 100 Cycle Ok necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | | No. 7/22mm | 1 | 0.6 | 56923 | 94872 | 100 Cycle Ok necking | rmacias |
| |
UTM
|
400kip
|
Temperature
|
72.00 f
|
DIME Test ID: 2023-07-13-2-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 12/29/2023
Date Tested: 08/29/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: 100 Cycle
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | | No. 7/22mm | 1 | 0.6 | 52904 | 88174 | 100 Cycle | rmacias |
| |
UTM
|
400kip
|
Temperature
|
72.00 f
|
DIME Test ID: 2023-07-13-2-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 12/29/2023
Date Tested: 08/29/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: 100 Cycle Ok necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | | No. 7/22mm | 1 | 0.6 | 56691 | 94484 | 100 Cycle Ok necking | rmacias |
| |
UTM
|
400kip
|
Temperature
|
72.00 f
|
DIME Test ID: 2023-07-13-2-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 12/29/2023
Date Tested: 08/29/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: 100 Cycle Ok necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 4 | | No. 7/22mm | 1 | 0.6 | 56707 | 94512 | 100 Cycle Ok necking | rmacias |
| |
UTM
|
400kip
|
Temperature
|
72.00 f
|
DIME Test ID: 2023-07-13-2-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 12/29/2023
Date Tested: 08/29/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: 100 Cycle Ok necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 5 | | No. 7/22mm | 1 | 0.6 | 56897 | 94828 | 100 Cycle Ok necking | rmacias |
| |
UTM
|
400kip
|
Temperature
|
72.00 f
|
DIME Test ID: 2023-07-13-2-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 12/29/2023
Date Tested: 08/29/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Break 1 Ok necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 6 | | No. 7/22mm | 1 | 0.6 | 56785 | 94641 | Break 1 Ok necking | rmacias |
| |
UTM
|
400kip
|
Temperature
|
72.00 f
|
DIME Test ID: 2023-07-13-2-7
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 12/29/2023
Date Tested: 08/29/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Break 2 Ok necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 7 | | No. 7/22mm | 1 | 0.6 | 56864 | 94774 | Break 2 Ok necking | rmacias |
| |
UTM
|
400kip
|
Temperature
|
72.00 f
|
DIME Test ID: 2023-07-13-2-8
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 12/29/2023
Date Tested: 08/29/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Break 3 Ok necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 8 | | No. 7/22mm | 1 | 0.6 | 56978 | 94963 | Break 3 Ok necking | rmacias |
| |
UTM
|
400kip
|
Temperature
|
72.00 f
|