Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 214451 DEA: 07303704 EFIS: 0714000035
QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-101-8.0/27.3
Work Description: REPLACE CONCRETE BARRIERS.
Location Description: THE CITY AND COUNTY OF LOS ANGELES FROM PILGRIMAGE OVERCROSSING TO VALLEY CIRCLE BOULEVARD OVERCROSSING
Contractor Name: OHL USA
Contractor Address: 1920 Main Street, Suite 310, Irvine, California 92614
Resident Engineer: Kevin Bui Structure Rep.: Kwangsuk Suh
DIME Sample ID: 2023-06-10-8
TL Number from the TL Form:
Sample Submitted By Organization: Alta Vista Solutions - Whittier
Sample Organization Contact: (510) 542-9827
Type of Sample: Quality Assurance
Type of Material: Soil
Sample Taken Date: 06/10/2023
Date that the sample was received by the laboratory/organization performing the testing: 06/10/2023
The quantity of what the sample constitutes: 1875 sqft
A brief description of the sample: Native - Subgrade
From where was the sample collected: Job Site
Laboratory sample identification: 23-0828
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: n/a
The fabricator's/manufacturer's product name for the sample:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: CTM 231 Test Holes
Where the material sample would have been placed if not sampled:
DIME Test ID: 2023-06-10-8-1
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Verified Date: 07/05/2023
Date Tested: 06/10/2023
Submitted By Organization: Alta Vista Solutions - Whittier
Organization Address: 12409 Slauson Avenue, Suite I,
Organization City: Whittier
Organization State: CA
Organization Zipcode: 90606
Organization Email: nicholas.hoffmann@oneatlas.com
Organization Phone: (510) 542-9827
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Standard Count Density
|
10050 g/cc
|
Count or Density 1
|
15753 g/cc
|
Count or Density 2
|
15733 g/cc
|
Count or Density 3
|
16091 g/cc
|
Standard Count Moisture
|
15617 g/cc
|
Moisture Count 1
|
3050 g/cc
|
Moisture Count 2
|
3123 g/cc
|
Moisture Count 3
|
3075 g/cc
|
Sum of Count or Density
|
47577.00 g/cc
|
Average of Count or Density
|
15859.00 g/cc
|
Sum of Moisture Count
|
9248.00 g/cc
|
Average of Moisture Count
|
3083.00 g/cc
|
Count Ratio Density
|
1.58
|
Count Ratio Moisture
|
0.20
|
Calculated Percent Relative Compaction
|
94.8 %
|
Reported Percent Relative Compaction
|
95 %
|
DIME Test ID: 2023-06-10-8-2
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Verified Date: 07/05/2023
Date Tested: 06/10/2023
Submitted By Organization: Alta Vista Solutions - Whittier
Organization Address: 12409 Slauson Avenue, Suite I,
Organization City: Whittier
Organization State: CA
Organization Zipcode: 90606
Organization Email: nicholas.hoffmann@oneatlas.com
Organization Phone: (510) 542-9827
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Is oversize material
|
Yes
|
In-place wet density
|
2.14
|
Percentage passing 3/4 in. sieve
|
89 %
|
Percentage retained on 3/4 in. sieve
|
11 %
|
Specific gravity of material passing 3/4 in. sieve
|
2.02
|
Specific gravity of material retained on 3/4 in. sieve
|
40.27 %
|
Coefficient for 3/4 in. aggregate
|
1.00
|
Corrected density
|
2.26
|
Relative compaction
|
95
|
% Moisture
|
8.1 %
|
Optimum Moisture
|
8.1 %
|