Print Report | Back to Sample Detail

Sample Record for 2023-06-11-14

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 212498 DEA: 021H5204 EFIS: 0217000009 QA Service Level: 1
DIST-CO-RTE-PM: 02-SIS-3,263-48.5/49.7 - 49.41
Work Description: Roadway Rehabilitation
Location Description: 02-Sis-3, 263-R46.8/R48.0, 49.07/49.41
Contractor Name: Myers-Shea JV
Contractor Address: 45 Morrison Ave, Sacramento, CA 95838
Resident Engineer: Austin Henry Structure Rep.: Nicolas Jimenez

Sample Information

DIME Sample ID: 2023-06-11-14
TL Number from the TL Form:
Sample Submitted By Organization: CT D02 - Yreka Field Laboratory
Sample Organization Contact: (530) 605-5861
Type of Sample: Department Acceptance
Type of Material: Concrete
Sample Taken Date: 06/11/2023
Date that the sample was received by the laboratory/organization performing the testing: 06/22/2023
The quantity of what the sample constitutes: 82 yds
A brief description of the sample: Concrete beams
From where was the sample collected: Job Site
Laboratory sample identification: 6-13-23
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Meyers Batch Plant

Material Information

The concrete mix design number: 800 RS
The truck number from where the sample was collected: Load 4
The batch plant ticket number from where the sample was collected: tt45
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: mixer truck chute
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results