Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 213918 DEA: 063HT014 EFIS: 0615000116
QA Service Level: 2
DIST-CO-RTE-PM: 06---
Work Description: (Alternative Delivery)
Location Description:
Contractor Name: Dragados Flatiron Joint Venture (DFJV)
Contractor Address: Unknown
Resident Engineer: Fernando De Alba Structure Rep.: Nathan Quiroz
DIME Sample ID: 2023-06-27-4
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - FFS - Skid Testing
Sample Organization Contact: (916) 227-7287
Type of Sample: Acceptance
Type of Material: Roadway/Bridge Surface
Sample Taken Date: 06/27/2023
Date that the sample was received by the laboratory/organization performing the testing: 06/27/2023
The quantity of what the sample constitutes: BRIDGE
A brief description of the sample: BRIDGE
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name: DAVIS AVE OC
The fabricator/manufacturer/facility name: JOB SITE
DIME Test ID: 2023-06-27-4-1
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 07/05/2023
Date Tested: 07/03/2023
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: WB APPROACH
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck?
|
Bridge Deck
|
Average Coefficient of Friction
|
0.39
|
DIME Test ID: 2023-06-27-4-2
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 07/05/2023
Date Tested: 07/03/2023
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: WB BRIDGE
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck?
|
Bridge Deck
|
Average Coefficient of Friction
|
0.39
|
DIME Test ID: 2023-06-27-4-3
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 07/05/2023
Date Tested: 07/03/2023
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: EB DEPARTURE
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck?
|
Bridge Deck
|
Average Coefficient of Friction
|
0.41
|
DIME Test ID: 2023-06-27-4-4
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 07/05/2023
Date Tested: 07/03/2023
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: EB BRIDGE
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck?
|
Bridge Deck
|
Average Coefficient of Friction
|
0.38
|
DIME Test ID: 2023-06-27-4-5
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 10/11/2023
Date Tested: 10/09/2023
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: KANSAS AVE OC BRIDGE WB
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck?
|
Bridge Deck
|
Average Coefficient of Friction
|
0.38
|
DIME Test ID: 2023-06-27-4-6
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 10/11/2023
Date Tested: 10/09/2023
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: KANSAS AVE OC BRIDGE EB
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck?
|
Bridge Deck
|
Average Coefficient of Friction
|
0.38
|
DIME Test ID: 2023-06-27-4-7
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 10/27/2023
Date Tested: 10/25/2023
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: BRIDGE #50-C0416-
NB APPROACH SLAB 34-.31-.26=.33 avg
DEPT SLAB-.33-.33-.33=.33 AVG.
Test Result Compliance: does not comply
Additional Comments When Verified:
Pavement or Bridge Deck?
|
Bridge Deck
|
Average Coefficient of Friction
|
0.33
|
DIME Test ID: 2023-06-27-4-8
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 10/27/2023
Date Tested: 10/25/2023
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: EB MCCOMBS AVE OH/50-0544
APPROACH SLAB-.38-.38-.39=.38 AVG
DEPT SLAB-.44-.45-.45=.45 AVG
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck?
|
Bridge Deck
|
Average Coefficient of Friction
|
0.38
|
DIME Test ID: 2023-06-27-4-9
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 10/27/2023
Date Tested: 10/25/2023
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: WB MCCOMBS AVE OH/50-0544 AND APPROACH SLAB-.37-.37-.34=.36 AVG
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck?
|
Bridge Deck
|
Average Coefficient of Friction
|
0.39
|
DIME Test ID: 2023-06-27-4-10
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 10/27/2023
Date Tested: 10/25/2023
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: WB MCCOMBS AVE OH/50-0544 DEPARTURE SLAB
Test Result Compliance: does not comply
Additional Comments When Verified:
Pavement or Bridge Deck?
|
Bridge Deck
|
Average Coefficient of Friction
|
0.31
|
DIME Test ID: 2023-06-27-4-11
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 10/27/2023
Date Tested: 10/25/2023
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: EB MERCED AVE OH BRIDGE APPROACH SLAB-.37-.37-.37= .37 AVG
DEPARTURE SLAB-.46-.44-.41=.44AVG
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck?
|
Bridge Deck
|
Average Coefficient of Friction
|
0.43
|
DIME Test ID: 2023-06-27-4-12
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 10/27/2023
Date Tested: 10/25/2023
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: WB MERCED AVE OH BRIDGE APPROACH SLAB-.43-.45-.41=.43 AVG
DEPARTURE SLAB-.48-.42-.46=.45 AVG
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck?
|
Bridge Deck
|
Average Coefficient of Friction
|
0.43
|
DIME Test ID: 2023-06-27-4-13
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 11/07/2023
Date Tested: 10/25/2023
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: AVE 9 OH/BR # S-OH-177.9
EB- .36-.41-.38= .38 AVG WHICH COMPLIES AS WELL
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck?
|
Bridge Deck
|
Average Coefficient of Friction
|
0.40
|
DIME Test ID: 2023-06-27-4-14
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
Data has not been verified.
DIME Test ID: 2023-06-27-4-15
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 05/02/2024
Date Tested: 05/01/2024
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: FLINT AVE O.C-BR#45C0148 WB
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck?
|
Bridge Deck
|
Average Coefficient of Friction
|
0.39
|