STATE OF CALIFORNIA - CALIFORNIA STATE TRANSPORTATION AGENCY

Gavin Newsom, Governor


DEPARTMENT OF TRANSPORTATION

DIVISION OF ENGINEERING SERVICES

MATERIALS ENGINEERING AND TESTING SERVICES

Concrete Materials Testing Branch

5900 Folsom Blvd.

Sacramento, CA 95819

916-227-7205

image

Contract # 04297634 Cty ALA Rte 84 PM 17.9/21

Vendor #


REPORT OF LABORATORY TESTING

Resident Engineer:

Paramjit Pandher

Date Reported:

06/16/2023

Address:

TL Number:

169976

City:

Project Name: ROUTE 84 WIDENING (4-LANE EXPRESSWAY) FROM I-680 TO PIGEON PASS, INCLUDING INTERSECTION, DRAINAGE IMPROVEMENTS AND UTILITY RELOCATION.

Prime Contractor: Bay Cities Paving & Grading

Sample Taken Date:

05/19/2023

Mix Design:

D10115EA

Contractor: Unknown

Location: ALAMEDA COUNTY IN AND NEAR SUNOL, PLEASANTON, AND LIVERMORE ON ROUTE 84 FROM 0.1 MILE EAST OF ROUTE 680 TO 0.1 MILE SOUTH OF RUBY HILL DRIVE AND ON ROUTE 680 FROM 1.2 MILES SOUTH TO 1.8 MILES NORTH OF ROUTE 84

Structure unique identifier:

Structure name:

Location of Pour:


The following testing has been tested in accordance with:

ASTM C39-21: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens

Unit system used?Number of specimensTest performedAverage diameter of cylinder 1Average diameter of cylinder 2Average diameter of cylinder 3Cross sectional area of cylinder 1Cross sectional area of cylinder 2Cross sectional area of cylinder 3Compressive strength (to nearest 10 psi)Maximum load on cylinder 1Maximum load on cylinder 2Maximum load on cylinder 3Compressive strength of cylinder 1Type of fracture pattern of cylinder 1Compressive strength of cylinder 2Compressive strength of cylinder 3Type of fracture pattern of cylinder 2Type of fracture pattern of cylinder 3Correction factor for cylinder 1Correction factor for cylinder 2Correction factor for cylinder 3Age of specimen
US Units3With no density determined4.024.024.0312.6912.6912.7638004234448534541873336.013824.04248111.001.001.0028

DIME Test ID: 2023-05-19-21-1
Certified By: Spencer Adams



Summary of Items Observed and Conversations:

Comments: This report is for the purpose of reporting test results.
Should you require recommendations concerning repairs or remedial efforts please contact the METS representative,
who represents the Materials Engineering and Testing Services for your project.

*Subject to final inspection by the Resident Engineer.




TL- Report of Laboratory Testing