Print Report | Back to Sample Detail

Sample Record for 2023-04-24-59

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 993845 DEA: 081J3604 EFIS: 0818000028 QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-215-13.9
Work Description: MODIFYING SIGNAL AND LIGHTING SYSTEMS, HMA AND TRAFFIC CONTROL SYSTEM.
Location Description: SAN BERNARDINO COUNTY IN SAN BERNARDINO AT PALM AVENUE UNDERCROSSING
Contractor Name: ALFARO COMMUNICATIONS CONSTRUCTION, INC
Contractor Address: 15614 S ATLANTIC AVENUE, COMPTON CA 90221
Resident Engineer: Dominic Ehirim Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2023-04-24-59
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Per Request
Type of Material: Asphalt Binder
Sample Taken Date: 04/24/2023
Date that the sample was received by the laboratory/organization performing the testing: 04/26/2023
The quantity of what the sample constitutes: 1 Quart Can
A brief description of the sample: PG Asphalt Binder
From where was the sample collected: Supplier
Laboratory sample identification: 0216-23
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: AAA-Corona

Material Information

Performance Grade: PG 64-16
Modified: No
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: San Joaquin Refinery - Bakersfield CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:

Test Results

Test 1 of 7

DIME Test ID: 2023-04-24-59-1
Test Method: AASHTO T228-22: Standard Method of Test for Specific Gravity of Semi-Solid Asphalt Materials (Specific Gravity)
Verified Date: 05/19/2023
Date Tested: 05/04/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: not applicable
Additional Comments When Verified:
Specific Gravity 1.020

Test 2 of 7

DIME Test ID: 2023-04-24-59-2
Test Method: AASHTO T315-12: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 05/19/2023
Date Tested: 05/04/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test: ORIGINAL
Test Result Compliance: complies
Additional Comments When Verified:
Phase Original binder
Phase Angle (δ) (for the 10 cycles) 88.2 degree
Dynamic Shear, G*/sin(δ) 1.41 kPa
(G*) x sin(δ)= no data

Test 3 of 7

DIME Test ID: 2023-04-24-59-3
Test Method: AASHTO T315-16: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 05/19/2023
Date Tested: 05/04/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test: RTFO
Test Result Compliance: complies
Additional Comments When Verified:
Phase Original binder
Test Plate Diameter 25 mm
Phase Angle (δ) (for the 10 cycles) 85.7 degree
Dynamic Shear, G*/sin(δ) 3.82 kPa

Test 4 of 7

DIME Test ID: 2023-04-24-59-4
Test Method: AASHTO T316-17: Standard Method of Test for Viscosity Determination of Asphalt Binder Using Rotational Viscometer
Verified Date: 05/19/2023
Date Tested: 05/04/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is viscosity reading in cP/Pa-s? Pa-s
Time of test 5:50 HH:MM
Test Temperature 135 C
Speed 100 rpm
Spindle size 21 in
Torque 75 %
Viscosity reading #1 (A) 0.373 Pa-s
Viscosity reading #2 (B) 0.374 Pa-s
Viscosity reading #3 (C) 0.378 Pa-s
Average viscosity 0.375 Pa-s

Test 5 of 7

DIME Test ID: 2023-04-24-59-5
Test Method: AASHTO T44-18: Standard Method of Test for Solubility of Bituminous Materials
Verified Date: 05/19/2023
Date Tested: 05/04/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Was test performed on residue from distillation or evaporation? NA
Soluble, percent 99.8 %
Insoluble, percent 0.2 %

Test 6 of 7

DIME Test ID: 2023-04-24-59-6
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Verified Date: 05/19/2023
Date Tested: 05/04/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test: Corrected -0.030+.006=-0.024
Test Result Compliance: complies
Additional Comments When Verified:
Is mass change based on one or two containers? Two
Any material loss from containers during heating process/testing? Yes
Mass of empty container #1 172.725 grams
Mass of empty container #2 176.518 grams
Mass of container #1 before test (m1i) 207.767 grams
Mass of container #2 before test (m2i) 211.646 grams
Mass of container #1 after test (m1f) 207.761 grams
Mass of container #2 after test (m2f) 211.631 grams
Average mass change -0.030 percent

Test 7 of 7

DIME Test ID: 2023-04-24-59-7
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
Data has not been verified.