Print Report | Back to Sample Detail

Sample Record for 2023-04-26-10

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 88888 DEA: SMTL-STOCK EFIS: SMTL-STOCK QA Service Level:
DIST-CO-RTE-PM: 59---
Work Description: Special project for SMTL stock material. Object Code: 1025. J2 DEA: 912680.
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2023-04-26-10
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Authorization
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 04/26/2023
Date that the sample was received by the laboratory/organization performing the testing: 04/26/2023
The quantity of what the sample constitutes: 15
A brief description of the sample: #6 x 3' dia.
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: RKR Steel Welding

Material Information

Production or Authorization Testing: Authorization Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 1202049061
Hoop Manufacturer Lot Number(s): L-2
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: #6
Diameter of Hoop: 3'-0"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Nucor
Welding Company: RKR Steel Welding
Coating Standards: Uncoated
Weld Type: Flash Welded

Test Results

Test 1 of 8

DIME Test ID: 2023-04-26-10-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 07/07/2023
Date Tested: 05/24/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: 100 Cycle-1 Broke at Weld
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
1No. 6/19mmL-20.443650882973100 Cycle-1 Broke at Weldbewing
UTM 400kip
Temperature 72.00 f

Test 2 of 8

DIME Test ID: 2023-04-26-10-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 07/07/2023
Date Tested: 05/24/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: 100 Cycle-2
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
2No. 6/19mmL-20.444384299641100 Cycle-2bewing
UTM 400kip
Temperature 72.00 f

Test 3 of 8

DIME Test ID: 2023-04-26-10-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 07/07/2023
Date Tested: 05/24/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: 100 Cycle-3
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
3No. 6/19mmL-20.444396799925100 Cycle-3bewing
UTM 400kip
Temperature 72.00 f

Test 4 of 8

DIME Test ID: 2023-04-26-10-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 07/07/2023
Date Tested: 05/24/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: 100 Cycle-4
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
4No. 6/19mmL-20.444386699695100 Cycle-4bewing
UTM 400kip
Temperature 72.00 f

Test 5 of 8

DIME Test ID: 2023-04-26-10-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 07/07/2023
Date Tested: 05/24/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: 100 Cycle-5
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
5No. 6/19mmL-20.4444163100370100 Cycle-5bewing
UTM 400kip
Temperature 72.00 f

Test 6 of 8

DIME Test ID: 2023-04-26-10-7
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 07/07/2023
Date Tested: 05/24/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Break-1
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
6No. 6/19mmL-20.444387899722Break-1bewing
UTM 400kip
Temperature 72.00 f

Test 7 of 8

DIME Test ID: 2023-04-26-10-8
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 07/07/2023
Date Tested: 05/24/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Break-2
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
7No. 6/19mmL-20.4444254100577Break-2bewing
UTM 400kip
Temperature 72.00 f

Test 8 of 8

DIME Test ID: 2023-04-26-10-9
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 07/07/2023
Date Tested: 05/24/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Break-3
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
8No. 6/19mmL-20.4444176100400Break-3bewing
UTM 400kip
Temperature 72.00 f