Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 043Y2404 Cty ALA/CC Rte Var PM Var/Var Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Unknown |
Date Reported: |
05/01/2023 |
|
Address: |
TL Number: |
|
||
City: |
||||
Project Name: *** Materials Admin still needs to verify this project's Project Type and Service Level *** |
||||
Prime Contractor: Bay Cities Paving and Grading |
||||
Sample Taken Date: |
04/03/2023 |
Mix Design: |
564-BFCR |
|
Contractor: Unknown |
Location: *** Materials Admin still needs to verify this project's Project Type and Service Level *** |
|||
Structure unique identifier: |
||||
Structure name: retaining Wall |
||||
Location of Pour: Soldier Pile dry concrete backfil pile |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 4.01 | 12.63 | 80107 | 6343.0 | 1 |
2 | 4.01 | 12.63 | 86772 | 6871.0 | 1 |
3 | 4.00 | 12.57 | 84078 | 6691 | 4 |
DIME Test ID: 2023-04-03-21-1
Number of specimens: 3
Compressive strength (to nearest 10 psi): 6640
Age of specimen: 28 days
Certified By: Spencer Adams
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing