Print Report | Back to Sample Detail

Sample Record for 2023-02-08-39

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 208973 DEA: 120H1004 EFIS: 1200000180 COOP: 120670 QA Service Level: 1
DIST-CO-RTE-PM: 12-ORA-405,73,405,605-9.3/24.3
Work Description: (Alternative Delivery) San Diego Freeway (I-405) Improvement Project SR-73 to I-605, Design Build Project, Administered by Orange County Transportation Authority, Caltrans METS to perform Source Inspection per RFP.
Location Description: Orange and Los Angeles Counties: 12-ORA-405 PM 9.3/24.2 / 07-LA-405 PM 0.0/1.2 12-ORA-22 PM R0.7/R3.8 / 12-ORA-22 PM R0.5/R0.7 12-ORA-73 PM R27.2/R27.8 / 12-ORA-605 PM 3.5/R1.6 07-LA-605 PM R0.0/R1.2
Contractor Name: OC 405 Partners
Contractor Address: 3100 W Lake Center Dr, Santa Ana, CA 92704
Resident Engineer: Hank Alonso (reports) Structure Rep.: Alex Angha (reports)

Sample Information

DIME Sample ID: 2023-02-08-39
TL Number from the TL Form:
Sample Submitted By Organization: CT D12 - Huntington Beach Field Laboratory
Sample Organization Contact: 9492798846
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 02/08/2023
Date that the sample was received by the laboratory/organization performing the testing: 02/09/2023
The quantity of what the sample constitutes: 2
A brief description of the sample: 6x12 concrete cylinders
From where was the sample collected: Job Site
Laboratory sample identification: 23-0029
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Robertson's / Santa Ana #17

Material Information

The concrete mix design number: RRM18161
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: 1
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: 405-73 HOV Abut 9 Approach Slab
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results

Test 1 of 1

DIME Test ID: 2023-02-08-39-1
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 05/15/2023
Date Tested: 03/08/2023
Submitted By Organization: CT D12 - Huntington Beach Field Laboratory
Organization Address: 19601 Beach Boulevard,
Organization City: Huntington Beach
Organization State: CA
Organization Zipcode: 92648
Organization Email: frank.mai@dot.ca.gov
Organization Phone: (949) 279-8846
General Comments for this Test:
Test Result Compliance: does not comply
Additional Comments When Verified:
Unit system used? US Units
Number of specimens 2
Test performed With no density determined
Capped in accordance with? ASTM C39 - Ground End
Average diameter of cylinder 1 5.99 in
Average diameter of cylinder 2 5.99 in
Cross sectional area of cylinder 1 28.17 in^2
Cross sectional area of cylinder 2 28.17 in^2
Compressive strength (to nearest 10 psi) 2910 psi
Maximum load on cylinder 1 69990 lb
Maximum load on cylinder 2 93650 lb
Type of fracture pattern of cylinder 1 2
Type of fracture pattern of cylinder 2 2
Comment on any defect in either specimen or caps (Max 250 Characters) no data
Correction factor for cylinder 1 1
Correction factor for cylinder 2 1
Age of specimen 28 days
Age of specimen in hours 0 hours