DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 042K2404 Cty SON Rte 101 PM 16.5-19 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
leonard brajnikoff |
Date Reported: |
03/14/2023 |
|
Address: |
TL Number: |
|
||
City: |
||||
Project Name: REMOVE EXISTING AND CONSTRUCT NEW CONCRETE BRIDGE RAILING. |
||||
Prime Contractor: Bridgeway Civil Constructors, Inc |
||||
Sample Taken Date: |
02/14/2023 |
Mix Design: |
SL-4201CG |
|
Contractor: Unknown |
Location: MARIN AND SONOMA COUNTIES AT VARIOUS LOCATIONS |
|||
Structure unique identifier: |
||||
Structure name: Baker Ave OC |
||||
Location of Pour: |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 4.02 | 12.69 | 72167 | 5686.0 | 2 |
2 | 4.02 | 12.69 | 86996 | 6854.0 | 1 |
3 | 4.01 | 12.63 | 82777 | 6554 | 4 |
DIME Test ID: 2023-02-14-19-1
Number of specimens: 3
Compressive strength (to nearest 10 psi): 6360
Age of specimen: 28 days
Certified By: Spencer Adams
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing