Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 993124 DEA: 101F1704 EFIS: 1016000032
QA Service Level: 1
DIST-CO-RTE-PM: 10-SJ-26,99-1.1,19.3
Work Description: REMOVE AND REPLACE BRIDGE.
Location Description: SAN JOAQUIN COUNTY NEAR STOCKTON AT ROUTE 26/99 SEPARATION
Contractor Name: Andrew M Jordan Inc, DBA A & B Construction
Contractor Address: 1350 4th Street, Berkeley, CA 94710
Resident Engineer: Troy Scheiber Structure Rep.: Chuck Pazzi
DIME Sample ID: 2023-02-01-29
TL Number from the TL Form: 032235
Sample Submitted By Organization: CT D10 - District 10 Materials Laboratory
Sample Organization Contact: (209) 948-7567
Type of Sample: Quality Assurance
Type of Material: Hot Mix Asphalt
Sample Taken Date: 02/01/2023
Date that the sample was received by the laboratory/organization performing the testing: 02/06/2023
The quantity of what the sample constitutes: 16 boxs 17lb ea
A brief description of the sample: 1/2 HMA-A
From where was the sample collected: Manufacturer
Laboratory sample identification: 23-H-009
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Teichert Vernalis
DIME Test ID: 2023-02-01-29-1
Test Method: AASHTO T209-12: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity)
Verified Date: 04/19/2023
Date Tested: 02/10/2023
Submitted By Organization: CT D10 - District 10 Materials Laboratory
Organization Address: 1976 East Dr. Martin Luther King Jr. Boulevard,
Organization City: Stockton
Organization State: CA
Organization Zipcode: 95205
Organization Email: mandeep.dhesi@dot.ca.gov
Organization Phone: (209) 948-7567
General Comments for this Test:
Test Result Compliance: not applicable
Additional Comments When Verified:
Number of tests
|
1
|
What is the unit of measurement for theoretical density?
|
US Units
|
Mass Determination
|
Water
|
Specific Gravity for Sample 1
|
2.477
|
Theoretical maximum density at 25°C (77°F)
|
154.2 lb/ft^3
|
DIME Test ID: 2023-02-01-29-2
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Verified Date: 04/19/2023
Date Tested: 02/10/2023
Submitted By Organization: CT D10 - District 10 Materials Laboratory
Organization Address: 1976 East Dr. Martin Luther King Jr. Boulevard,
Organization City: Stockton
Organization State: CA
Organization Zipcode: 95205
Organization Email: mandeep.dhesi@dot.ca.gov
Organization Phone: (209) 948-7567
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
DIME Test ID: 2023-02-01-29-3
Test Method: AASHTO T275-07r12: Standard Method of Test for Bulk Specific Gravity (Gmb) of Compacted Asphalt Mixtures Using Paraffin-Coated Specimens (Bulk Specific Gravity)
Verified Date: 04/19/2023
Date Tested: 02/10/2023
Submitted By Organization: CT D10 - District 10 Materials Laboratory
Organization Address: 1976 East Dr. Martin Luther King Jr. Boulevard,
Organization City: Stockton
Organization State: CA
Organization Zipcode: 95205
Organization Email: mandeep.dhesi@dot.ca.gov
Organization Phone: (209) 948-7567
General Comments for this Test:
Test Result Compliance: not applicable
Additional Comments When Verified:
Bulk Specific Gravity
|
2.354
|
DIME Test ID: 2023-02-01-29-4
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 04/19/2023
Date Tested: 02/10/2023
Submitted By Organization: CT D10 - District 10 Materials Laboratory
Organization Address: 1976 East Dr. Martin Luther King Jr. Boulevard,
Organization City: Stockton
Organization State: CA
Organization Zipcode: 95205
Organization Email: mandeep.dhesi@dot.ca.gov
Organization Phone: (209) 948-7567
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
What temperature unit is used?
|
Fahrenheit
|
Test procedure used?
|
Method A
|
Mass of HMA Sample prior to ignition
|
1540.0 g
|
Corrected Asphalt Binder Content
|
5.86 %
|
Mass Loss
|
105.1 g
|
Correction Factor (Percent by mass of HMA Specimen)
|
0.77 %
|
Moisture Content
|
0.00 %
|
Temperature Compensation Factor
|
0.19 %
|
Test Temperature
|
538 F
|