Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 04152724 Cty CC Rte 4 PM R8.0/25.2&0.0/3.4 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
RANJEET SINGH |
Date Reported: |
09/09/2015 |
|
Address: |
TL Number: |
268118 |
||
City: |
||||
Project Name: INSTALL RAMP METERING AND TOS ELEMENTS. |
||||
Prime Contractor: BAY CITIES PAVING & GRADING INC |
||||
Sample Taken Date: |
08/12/2015 |
Mix Design: |
unknown |
|
Contractor: Unknown |
Location: CONTRA COSTA COUNTY AT VARIOUS LOCATIONS ON RTE 4 FROM WEST OF ALHAMBRA AVENUE TO EAST OF LOVERIDGE ROUTE D AND ON RTE 242 FROM ROUTE 680 TO ROUTE 4. |
|||
Structure unique identifier: Unknown |
||||
Structure name: Unknown |
||||
Location of Pour: Unknown |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 5.96 | 27.9 | 130066 | 4661.9 | 1 |
2 | 5.99 | 28.18 | 128727 | 4568.0 | 1 |
DIME Test ID: 2015-08-12-4-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 4610
Age of specimen: 28 days
Certified By: Bang Nguyen
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing