Print Report | Back to Sample Detail

Sample Record for 2022-12-21-72

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 993162 DEA: 07319104 EFIS: 0716000017 QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-91-R11.8
Work Description: ADJUST VERTICAL CLEARANCE WITH ROADWAY EXCAVATION AND PLACE JPCP.
Location Description: LOS ANGELES COUNTY IN LONG BEACH AT NORTHBOUND ROUTE 710 TO EASTBOUND ROUTE 91 CONNECTOR
Contractor Name: RV Concrete
Contractor Address: 605 E Commercial Street, Anaheim, CA 92801
Resident Engineer: Thang Ton Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2022-12-21-72
TL Number from the TL Form:
Sample Submitted By Organization: Alta Vista Solutions - Whittier
Sample Organization Contact: (510) 542-9827
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 12/21/2022
Date that the sample was received by the laboratory/organization performing the testing: 12/22/2022
The quantity of what the sample constitutes: 10 Cubic Yards
A brief description of the sample: Concrete Beams JPCP
From where was the sample collected: Job Site
Laboratory sample identification: 23-0013
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: n/a

Material Information

The concrete mix design number: LB060008
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: 7259221
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Wheelbarrow
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results

Test 1 of 2

DIME Test ID: 2022-12-21-72-1
Test Method: CTM 523-May 2020: Method of Test for Flexural Strength of Concrete
Verified Date: 01/20/2023
Date Tested: 01/18/2023
Submitted By Organization: Alta Vista Solutions - Whittier
Organization Address: 12409 Slauson Avenue, Suite I,
Organization City: Whittier
Organization State: CA
Organization Zipcode: 90606
Organization Email: nicholas.hoffmann@oneatlas.com
Organization Phone: (510) 542-9827
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Number of specimens 3
Unit system used? US Units
Does the testing machine measure load or stress on the beam specimen? Load
Fracture initiates in the tension surface Within the Middle Third of the Span Length
Is a beam dimensional correction factor used? Yes
Modulus of rupture average 670 psi
Modulus of rupture 675 psi
Modulus of rupture 2 680 psi
Modulus of rupture 3 655 psi
Age of specimen 28 days

Test 2 of 2

DIME Test ID: 2022-12-21-72-2
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Verified Date: 01/20/2023
Date Tested: 12/21/2022
Submitted By Organization: Alta Vista Solutions - Whittier
Organization Address: 12409 Slauson Avenue, Suite I,
Organization City: Whittier
Organization State: CA
Organization Zipcode: 90606
Organization Email: nicholas.hoffmann@oneatlas.com
Organization Phone: (510) 542-9827
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Air Content 1.3 %