Sample Record for 2022-10-11-55
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 208973 DEA: 120H1004 EFIS: 1200000180 COOP: 120670
QA Service Level: 1
DIST-CO-RTE-PM: 12-ORA-405,73,405,605-9.3/24.3
Work Description: (Alternative Delivery) San Diego Freeway (I-405) Improvement Project SR-73 to I-605, Design Build Project, Administered by Orange County Transportation Authority, Caltrans METS to perform Source Inspection per RFP.
Location Description: Orange and Los Angeles Counties: 12-ORA-405 PM 9.3/24.2 / 07-LA-405 PM 0.0/1.2 12-ORA-22 PM R0.7/R3.8 / 12-ORA-22 PM R0.5/R0.7 12-ORA-73 PM R27.2/R27.8 / 12-ORA-605 PM 3.5/R1.6 07-LA-605 PM R0.0/R1.2
Contractor Name: OC 405 Partners
Contractor Address: 3100 W Lake Center Dr, Santa Ana, CA 92704
Resident Engineer: Hank Alonso (reports) Structure Rep.: Alex Angha (reports)
Sample Information
DIME Sample ID: 2022-10-11-55
TL Number from the TL Form:
Sample Submitted By Organization: CT D12 - Huntington Beach Field Laboratory
Sample Organization Contact: 9492798846
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 10/11/2022
Date that the sample was received by the laboratory/organization performing the testing: 10/12/2022
The quantity of what the sample constitutes: 2+1 cylinders
A brief description of the sample: 6x12 concrete cylinders
From where was the sample collected: Job Site
Laboratory sample identification: 22-0392
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Robertson - Anaheim
Material Information
The concrete mix design number: 5264125A
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: 1
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: MIX TRUCK
Where the material sample would have been placed if not sampled: Montecito Channel College Park and Loyla
From Lot No.:
Bag Lot No.:
Test Results
Test 1 of 1
DIME Test ID: 2022-10-11-55-1
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 11/15/2022
Date Tested: 11/08/2022
Submitted By Organization: CT D12 - Huntington Beach Field Laboratory
Organization Address: 19601 Beach Boulevard,
Organization City: Huntington Beach
Organization State: CA
Organization Zipcode: 92648
Organization Email: frank.mai@dot.ca.gov
Organization Phone: (949) 279-8846
General Comments for this Test: @ 28 Days required 4,000 psi = Failed
Test Result Compliance:
Additional Comments When Verified:
Unit system used?
|
US Units
|
Number of specimens
|
2
|
Test performed
|
With no density determined
|
Capped in accordance with?
|
ASTM C39 - Ground End
|
Average diameter of cylinder 1
|
6.00 in
|
Average diameter of cylinder 2
|
6.00 in
|
Cross sectional area of cylinder 1
|
28.27 in^2
|
Cross sectional area of cylinder 2
|
28.27 in^2
|
Compressive strength (to nearest 10 psi)
|
1790 psi
|
Maximum load on cylinder 1
|
55820 lb
|
Maximum load on cylinder 2
|
44980 lb
|
Type of fracture pattern of cylinder 1
|
5
|
Type of fracture pattern of cylinder 2
|
5
|
Comment on any defect in either specimen or caps (Max 250 Characters)
|
no data
|
Correction factor for cylinder 1
|
1
|
Correction factor for cylinder 2
|
1
|
Age of specimen
|
28 days
|
Age of specimen in hours
|
no data0 hours
|