Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 041J5204 Cty SM Rte 84 PM R28.8/R29.3,R0.5 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Harpal Chahal |
Date Reported: |
07/15/2015 |
|
Address: |
TL Number: |
1 and 2 |
||
City: |
||||
Project Name: INSTALL SIDEWALK, SITE FURNISHINGS, SIGNS, NATIVE PLANTING, IRRIGATION |
||||
Prime Contractor: GORDON N BALL INC |
||||
Sample Taken Date: |
06/17/2015 |
Mix Design: |
7201 |
|
Contractor: Unknown |
Location: SAN MATEO AND ALAMEDA COUNTIES IN MENLO PARK AND FREMONT AT PM 29.3 AND PM 0.5 |
|||
Structure unique identifier: Unknown |
||||
Structure name: Unknown |
||||
Location of Pour: Unknown |
The following testing has been tested in accordance with:
ASTM C39-10 : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Specimen | Cross sectional area of cylinder (in^2) | Average diameter of cylinder (in) | Compressive strength of cylinder (psi) | Maximum load on cylinder (lb) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 28.46 | 6.02 | 5122.1 | 145775 | 1 |
2 | 28.46 | 6.02 | 5192.7 | 147785 | 1 |
DIME Test ID: 2015-06-17-5-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 5160
Age of specimen: 28 days
Certified By: Bang Nguyen
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing