Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 04014104 Cty ALA Rte 80 PM 2.6 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Behzad Halali |
Date Reported: |
07/30/2015 |
|
Address: |
TL Number: |
00007 |
||
City: |
||||
Project Name: CONSTRUCT SFOBB MAINTENANCE FACILITIES - PHASE II |
||||
Prime Contractor: TABER CONSTRUCTION INC |
||||
Sample Taken Date: |
06/18/2015 |
Mix Design: |
Unknown |
|
Contractor: Unknown |
Location: IN ALAMEDA COUNTY ON ROUTE 80 AT THE SAN FRANCISCO BAY BRIDGE MAINTENANCE YARD |
|||
Structure unique identifier: Unknown |
||||
Structure name: Unknown |
||||
Location of Pour: Unknown |
The following testing has been tested in accordance with:
ASTM C39-10 : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Specimen | Cross sectional area of cylinder (in^2) | Average diameter of cylinder (in) | Compressive strength of cylinder (psi) | Maximum load on cylinder (lb) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 28.09 | 5.98 | 5658.8 | 158956 | 1 |
2 | 28.18 | 5.99 | 5554.3 | 156521 | 1 |
DIME Test ID: 2015-06-18-13-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 5610
Age of specimen: 42 days
Certified By: Mike Mullins
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing