Project Information
Project ID: 209217 DEA: 080F5404 EFIS: 0800000136 COOP: 081468
QA Service Level: 1
DIST-CO-RTE-PM: 08-RIV-91,15-0.0/13.04, 35.64/45.14
Work Description: SR-91 Corridor Improvement Project: Develop approx. 8 miles of tolled express lanes and related improvements within SR 91 between the Riverside/Orange County line and I-15, including transition areas.
Location Description: 08-RIV-91-0.0/13.04; 12-ORA-91-R14.43/R18.91; 08-RIV-15-35.64/45.14
Contractor Name: Atkinson Walsh, Joint Venture
Contractor Address: 1785 Sampson Ave, Corona, CA 92879
Resident Engineer: Richard Hebert Structure Rep.: Cyrus Shahinpar
Sample Information
DIME Sample ID: 2015-06-02-3
TL Number from the TL Form: SRL 56
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Quality Control
Type of Material: Concrete
Sample Taken Date: 06/02/2015
Date that the sample was received by the laboratory/organization performing the testing: 06/02/2015
The quantity of what the sample constitutes: 6
A brief description of the sample: 6X12
From where was the sample collected: Job Site
Laboratory sample identification: 888-SRL56
Structure unique identifier: 91 CIP
Structure name: BR 25 STEM AND SOFFIT
The fabricator/manufacturer/facility name: JOB
Material Information
The concrete mix design number: 5640
The truck number from where the sample was collected: 633
The batch plant ticket number from where the sample was collected: 118025900
Concrete batch plant: Unknown
The fabricator/manufacturer designation for the sample: Unknown
A detailed description of where the material sample was collected: LOAD 4
Where the material sample would have been placed if not sampled: Unknown
From Lot No.:
Bag Lot No.:
Test Results
Tests Assigned to this Sample
DIME Test ID | Test Method | Assigned Date | Test Date | Assigned By | Assigned Lab | Test Comments | Assigned To |
2015-06-02-3-1 | CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete Cylinders | 06/04/2015 | 06/16/2015 | Matthew Clayton | CT D08 - Fontana Southern Regional Laboratory | 14 DAY | |
2015-06-02-3-2 | CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete Cylinders | 06/04/2015 | 06/23/2015 | Matthew Clayton | CT D08 - Fontana Southern Regional Laboratory | 21 DAY | |
2015-06-02-3-3 | CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete Cylinders | 06/04/2015 | 06/30/2015 | Matthew Clayton | CT D08 - Fontana Southern Regional Laboratory | 28 DAY | |
208820892090