Sample Record for 2022-07-28-48
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 208973 DEA: 120H1004 EFIS: 1200000180 COOP: 120670
QA Service Level: 1
DIST-CO-RTE-PM: 12-ORA-405,73,405,605-9.3/24.3
Work Description: (Alternative Delivery) San Diego Freeway (I-405) Improvement Project SR-73 to I-605, Design Build Project, Administered by Orange County Transportation Authority, Caltrans METS to perform Source Inspection per RFP.
Location Description: Orange and Los Angeles Counties: 12-ORA-405 PM 9.3/24.2 / 07-LA-405 PM 0.0/1.2 12-ORA-22 PM R0.7/R3.8 / 12-ORA-22 PM R0.5/R0.7 12-ORA-73 PM R27.2/R27.8 / 12-ORA-605 PM 3.5/R1.6 07-LA-605 PM R0.0/R1.2
Contractor Name: OC 405 Partners
Contractor Address: 3100 W Lake Center Dr, Santa Ana, CA 92704
Resident Engineer: Hank Alonso (reports) Structure Rep.: Alex Angha (reports)
Sample Information
DIME Sample ID: 2022-07-28-48
TL Number from the TL Form: C665565
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 07/28/2022
Date that the sample was received by the laboratory/organization performing the testing: 09/15/2022
The quantity of what the sample constitutes: 4
A brief description of the sample: Couplers
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CMC Rebar Etiwanda
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC
Coupler Manufacturer: HRC
Intermediate Assembler or Fabricator:
Rebar Size: #10
Coupler Model: HRC 500/510
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): 79001079, 74123596
Rebar Heat Number(s): 3115866, 4119781
Rebar Size 2 :
Coupler Unique ID: TP-17-03
Test Results
Test 1 of 3
DIME Test ID: 2022-07-28-48-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 09/15/2022
Date Tested: 09/15/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | | No. 10/32mm | 215 | 0.0021 | 1.27 | 115345 | 90823 | Ok Necking | bewing |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
Small
|
Test 2 of 3
DIME Test ID: 2022-07-28-48-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 09/15/2022
Date Tested: 09/15/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | | No. 10/32mm | 215 | 0 | 1.27 | 115089 | 90621 | Ok Necking | bewing |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
|
Test 3 of 3
DIME Test ID: 2022-07-28-48-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 09/15/2022
Date Tested: 09/15/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | | No. 10/32mm | 215 | 0 | 1.27 | 115837 | 91210 | Ok Necking | bewing |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
|