Sample Record for 2022-09-01-5
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 993333 DEA: 04264724 EFIS: 0419000068
QA Service Level: 1
DIST-CO-RTE-PM: 04-MRN-101-R20.8/27.1
Work Description: CIP BRIDGES, CONSTRUCT ROADWAY, RETAINING WALLS AND MODIFY ELECTRICAL.
Location Description: MARIN COUNTY IN AND NEAR NOVATO FROM 0.1 MILE SOUTH OF FRANKLIN AVENUE OVERHEAD TO 0.5 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE
Contractor Name: GHILOTTI CONSTRUCTION CO. INC. (RILEY GENAZZI & JOSH SERAFINO)
Contractor Address: 246 GHILOTTI AVE., SANTA ROSA, CA 95407
Resident Engineer: Fabio La Serna Structure Rep.: Jeremy Light
Sample Information
DIME Sample ID: 2022-09-01-5
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 09/01/2022
Date that the sample was received by the laboratory/organization performing the testing: 09/01/2022
The quantity of what the sample constitutes: 612
A brief description of the sample: #6 3'-8"
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CMC Rebar
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 4121274
Hoop Manufacturer Lot Number(s): 1-5
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: #6
Diameter of Hoop: 3'-8"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: CMC Arizona
Welding Company: California Department of Transportation
Coating Standards: Uncoated
Weld Type: Flash Welded
Test Results
Test 1 of 6
DIME Test ID: 2022-09-01-5-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 09/06/2022
Date Tested: 09/06/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 1 | 6/19mm | 0.44 | 47860.90 | 108775 | Ok Necking | bewing |
| |
UTM
|
450kip
|
Temperature
|
72 f
|
Test 2 of 6
DIME Test ID: 2022-09-01-5-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 09/06/2022
Date Tested: 09/06/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 1 | 6/19mm | 0.44 | 48187.00 | 109516 | Ok Necking | bewing |
| |
UTM
|
450kip
|
Temperature
|
72 f
|
Test 3 of 6
DIME Test ID: 2022-09-01-5-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 09/06/2022
Date Tested: 09/06/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 1 | 6/19mm | 0.44 | 48021.95 | 109141 | Ok Necking | bewing |
| |
UTM
|
450kip
|
Temperature
|
72 f
|
Test 4 of 6
DIME Test ID: 2022-09-01-5-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 09/06/2022
Date Tested: 09/06/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 3 | 6/19mm | 0.44 | 48103.10 | 109325 | Ok Necking | bewing |
| |
UTM
|
450kip
|
Temperature
|
72 f
|
Test 5 of 6
DIME Test ID: 2022-09-01-5-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 09/06/2022
Date Tested: 09/06/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 3 | 6/19mm | 0.44 | 47956.98 | 108993 | Ok Necking | bewing |
| |
UTM
|
450kip
|
Temperature
|
72 f
|
Test 6 of 6
DIME Test ID: 2022-09-01-5-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 09/06/2022
Date Tested: 09/06/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 3 | 6/19mm | 0.44 | 47783.65 | 108599 | Ok Necking | bewing |
| |
UTM
|
450kip
|
Temperature
|
72 f
|