Project Information

Project ID: 211260 DEA: 072159U4 EFIS: 0715000160 QA Service Level: 1
DIST-CO-RTE-PM: 07-LA,ORA-5-0.0/1.5, 44.3/44.4
Work Description: CONSTRUCT HOV LANES AND MIX FLOW LANES.
Location Description: LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK
Contractor Name: SECURITY PAVING COMPANY, INC.
Contractor Address: 3075 TOWNSGATE RD. SUITE 200, WESTLAKE VILLAGE, CA 91361
Resident Engineer: George Saker Structure Rep.: Danny Lalonde

Sample Information

DIME Sample ID: 2022-08-29-36
TL Number from the TL Form:
Sample Submitted By Organization: Kleinfelder, Incorporated - Los Angeles
Sample Organization Contact: (909) 833-5780
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 08/29/2022
Date that the sample was received by the laboratory/organization performing the testing: 08/30/2022
The quantity of what the sample constitutes: 570 CY
A brief description of the sample: A set of 2 JPCP concrete beam test specimens
From where was the sample collected: Job Site
Laboratory sample identification: 22-2283
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: SECURITY PAVING PORTABLE PLANT- LA MIRADA

Material Information

The concrete mix design number: G3-19-PCC-001
The truck number from where the sample was collected: NOT PROVIDED
The batch plant ticket number from where the sample was collected: NOT PROVIDED
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Concrete from wheelbarrow
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results

Test 1 of 1

DIME Test ID: 2022-08-29-36-1
Test Method: CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete
Verified Date: 09/27/2022
Date Tested: 09/26/2022
Submitted By Organization: Kleinfelder, Incorporated - Los Angeles
Organization Address: 620 South Magnolia Avenue, Building G,
Organization City: Ontario
Organization State: CA
Organization Zipcode: 91762
Organization Email: mdorsch@kleinfelder.com
Organization Phone: (909) 833-5780
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Number of specimens 2
Does the testing machine measure load or stress on the beam specimen? Load
Fracture initiates in the tension surface Within the Middle Third of the Span Length
Fracture occurred at a capped section No
Is a beam dimensional correction factor used? No
Age of specimen 28 days
Modulus of rupture 660 psi
Modulus of rupture 2 680 psi
Modulus of rupture average 670 psi