Print Report | Back to Sample Detail

Sample Record for 2022-04-20-80

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 993150 DEA: 051G9704 EFIS: 0516000008 QA Service Level: 1
DIST-CO-RTE-PM: 05-SB-135-11.7/17.8
Work Description: COLD PLANE, OVERLAY ROADWAY WITH RHMA (GAP GRADED) AND ADA CURB RAMPS.
Location Description: SANTA BARBARA COUNTY IN AND NEAR SANTA MARIA FROM LAKEVIEW ROAD TO NORTH SANTA MARIA CONNECTOR
Contractor Name: CAL PORTLAND CONSTRUCTION
Contractor Address: 1625 E. Donovan, Santa Maria, Ca 93454
Resident Engineer: Thomas Petersen Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2022-04-20-80
TL Number from the TL Form: 220420C
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Acceptance
Type of Material: Asphalt Rubber Binder
Sample Taken Date: 04/20/2022
Date that the sample was received by the laboratory/organization performing the testing: 07/15/2022
The quantity of what the sample constitutes: 1CANS
A brief description of the sample: PG64-16
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Valero - Benicia

Material Information

Asphalt modifier supplier:
Performance Grade: PG 64-16
Lot number: 1
Sublot number: 1
Asphalt Rubber Binder Mix Number:

Test Results

Test 1 of 3

DIME Test ID: 2022-04-20-80-1
Test Method: ASTM D217-16: Standard Test Methods for Cone Penetration of Lubricating Grease (Cone Penetration)
Verified Date: 08/19/2022
Date Tested: 08/18/2022
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Determination Unworked Penetration
Unworked Penetration 38 0.1 mm

Test 2 of 3

DIME Test ID: 2022-04-20-80-2
Test Method: ASTM D36-14ε1: Standard Test Method for Softening Point of Bitumen (Ring-and-Ball Apparatus) (Softening Point)
Verified Date: 08/19/2022
Date Tested: 08/18/2022
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
ASTM Thermometer used? C
Softening Point Sample 1 69 C
Softening Point Sample 2 69 C
Bath Liquid freshly boiled distilled water
Minutes Reaction no data

Test 3 of 3

DIME Test ID: 2022-04-20-80-3
Test Method: ASTM D5329-16: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Verified Date: 08/19/2022
Date Tested: 08/18/2022
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Temperature 25 C
Final Dial reading (F1) 72 mm
Ball Penetration (P1) 5 mm
Final Dial reading (F2) 67 mm
Ball Penetration (P2) 5 mm
Final Dial reading (F3) 71 mm
Ball Penetration (P3) 5 mm
Resilience 1 33 %
Resilience 2 38 %
Resilience 3 34 %
Average Resilience 35 %
Minutes Reaction no data