Print Report | Back to Sample Detail

Sample Record for 2015-04-20-3

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 3825 DEA: 07138204 EFIS: 0700000142 QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-47,103-3.5/4.6,0.0/1.1
Work Description: REPLACE STEEL BRIDGE WITH CIP PS CONCRETE BOX GIRDER BRIDGE AND RAMPS.
Location Description: LOS ANGELES COUNTY IN LONG BEACH AND LOS ANGELES ON ROUTE 47 FROM OCEAN BOULEVARD TO ROUTE 103 JUNCTION AND ON ROUTE 103 FROM ROUTE 47 JUNCTION TO ANAHEIM STREET OVERHEAD
Contractor Name: M C M CONSTRUCTION INC
Contractor Address: P O BOX 620, NORTH HIGHLANDS, CA 95660
Resident Engineer: Daniel Leon Structure Rep.: Andy Chen

Sample Information

DIME Sample ID: 2015-04-20-3
TL Number from the TL Form: 83457
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Verification
Type of Material: Concrete
Sample Taken Date: 04/20/2015
Date that the sample was received by the laboratory/organization performing the testing: 04/24/2015
The quantity of what the sample constitutes: 4
A brief description of the sample: 6x12
From where was the sample collected: Job Site
Laboratory sample identification: 816-57
Structure unique identifier: SCHUYLER HEIM BRIDGE
Structure name: HINGE 4 TOP
The fabricator/manufacturer/facility name: JOB

Material Information

The concrete mix design number: S85149
The truck number from where the sample was collected: 311
The batch plant ticket number from where the sample was collected: 161910
Concrete batch plant: Unknown
The fabricator/manufacturer designation for the sample: Unknown
A detailed description of where the material sample was collected: CHUT
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results

Test 1 of 2

DIME Test ID: 2015-04-20-3-1
Test Method: CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 04/29/2015
Date Tested: 04/29/2015
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Cross sectional area of cylinder 1 28.27 in^2
Cross sectional area of cylinder 2 28.27 in^2
Compressive strength (to nearest 10 psi) 4750 psi
Comment on any defect in either specimen or caps (Max 250 Characters) no data
Correction factor for cylinder 1 1
Age of specimen 9 days

Test 2 of 2

DIME Test ID: 2015-04-20-3-2
Test Method: CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 05/13/2015
Date Tested: 05/13/2015
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Cross sectional area of cylinder 1 28.27 in^2
Cross sectional area of cylinder 2 28.18 in^2
Compressive strength (to nearest 10 psi) 6030 psi
Comment on any defect in either specimen or caps (Max 250 Characters) no data
Correction factor for cylinder 1 1
Age of specimen 28 days