Print Report | Back to Sample Detail

Sample Record for 2022-06-24-52

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214685 DEA: 024E46U4 EFIS: 0216000122 QA Service Level: 1
DIST-CO-RTE-PM: 02-LAS-36-6.0/14.6
Work Description: REPLACE BRIDGE, ROADWAY EXCAVATION, HMA, CLASS 2 AB AND DRAINAGE WORK.
Location Description: LASSEN COUNTY NEAR WESTWOOD FROM 1.3 MILES WEST OF GOODRICH CREEK BRIDGE TO 1.0 MILE WEST OF WILLARD CREEK ROAD
Contractor Name: Hat Creek Construction
Contractor Address: 24339 Highway 89 N, Burney, CA 96013
Resident Engineer: Tim Crosby Structure Rep.: Jeff Rothgery

Sample Information

DIME Sample ID: 2022-06-24-52
TL Number from the TL Form: C896419
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Acceptance
Type of Material: Asphalt Binder
Sample Taken Date: 06/24/2022
Date that the sample was received by the laboratory/organization performing the testing: 07/29/2022
The quantity of what the sample constitutes: 1 OF 1 CAN
A brief description of the sample: PG58-34M PROJECT BINDER
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: MARATHON // PNAC

Material Information

Performance Grade: PG 58-34 M
Modified: Yes
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: PNAC LLC - Fernley NV
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:

Test Results

Test 1 of 2

DIME Test ID: 2022-06-24-52-1
Test Method: AASHTO T315-20: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 08/25/2022
Date Tested: 08/25/2022
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: ORIG
Test Result Compliance: complies
Additional Comments When Verified:
Phase Original binder
Test Plate Diameter 25 mm
Test Gap 1 mm
Test Frequency 10.0 rad/s
Strain Amplitude 12.00 %
Stress Amplitude 0.152 kPa
Phase Angle (δ) (for the 10 cycles) 68.2 degree
Complex Modulus (G*) (for the 10 measurements) 1.263 kPa
Test Temperature (Specimen 1) 58.0 C
Dynamic Shear, G*/sin(δ) 1.36 kPa

Test 2 of 2

DIME Test ID: 2022-06-24-52-2
Test Method: AASHTO T315-20: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 08/25/2022
Date Tested: 08/25/2022
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: RTFO
Test Result Compliance: complies
Additional Comments When Verified:
Phase RTFO residue
Test Plate Diameter 25 mm
Test Gap 1 mm
Test Frequency 10.0 rad/s
Strain Amplitude 10.00 %
Stress Amplitude 0.709 kPa
Phase Angle (δ) (for the 10 cycles) 57.3 degree
Complex Modulus (G*) (for the 10 measurements) 7.086 kPa
Test Temperature (Specimen 1) 58.0 C
Dynamic Shear, G*/sin(δ) 8.42 kPa