Print Report | Back to Sample Detail

Sample Record for 2022-07-26-23

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 215663 DEA: 060Y9304 EFIS: 0619000202 QA Service Level: 1
DIST-CO-RTE-PM: 06-KIN-198-R10.6/R14.8
Work Description: REPAIR BRIDGE COLUMNS.
Location Description: KINGS COUNTY IN AND NEAR LEMOORE AND ARMONA FROM 18TH AVENUE OVERCROSSING TO 14TH AVENUE UNDERCROSSING
Contractor Name: BOSCO CONSTRUCTORS INC
Contractor Address: 21353 MAYALL ST., CHATSWORTH CA 91311
Resident Engineer: Felix Vaquilar Structure Rep.: Nathan Quiroz

Sample Information

DIME Sample ID: 2022-07-26-23
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 07/26/2022
Date that the sample was received by the laboratory/organization performing the testing: 08/03/2022
The quantity of what the sample constitutes: 150 Couplers
A brief description of the sample: Dayton Superior Bar lock Couplers
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Bosco Constructors

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Cascade
Coupler Manufacturer: Dayton Superior
Intermediate Assembler or Fabricator:
Rebar Size: #11
Coupler Model: Bar Lock
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): MM20105026/ 189904
Rebar Heat Number(s): 378421
Rebar Size 2 :
Coupler Unique ID:

Test Results

Test 1 of 3

DIME Test ID: 2022-07-26-23-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 08/04/2022
Date Tested: 07/28/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
1No. 11/36mm1-0.00181.5614597593574Service Splicebewing
UTM 2000kip
Temperature 72.00 f
Halo ID Large

Test 2 of 3

DIME Test ID: 2022-07-26-23-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 08/04/2022
Date Tested: 07/28/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
2No. 11/36mm101.5614090590324Service Splicebewing
UTM 2000kip
Temperature 72.00 f
Halo ID

Test 3 of 3

DIME Test ID: 2022-07-26-23-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 08/04/2022
Date Tested: 07/28/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
3No. 11/36mm101.5614417892422Service Splicebewing
UTM 2000kip
Temperature 72.00 f
Halo ID