Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 041A5514 Cty SF Rte 101 PM 1.5/1.8,R4.1/R4.4 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Jose David |
Date Reported: |
04/08/2015 |
|
Address: |
TL Number: |
201466 |
||
City: |
||||
Project Name: REPLACE BARRIER RAILINGS |
||||
Prime Contractor: CC MYERS INC |
||||
Sample Taken Date: |
04/01/2015 |
Mix Design: |
na |
|
Contractor: Unknown |
Location: THE CITY AND COUNTY OF SAN FRANCISCO ON ROUTE 101 AND ROUTE 280 AT ROUTE 101/280 SEPARATION. |
|||
Structure unique identifier: Unknown |
||||
Structure name: Unknown |
||||
Location of Pour: |
The following testing has been tested in accordance with:
ASTM C39-10 : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Specimen | Cross sectional area of cylinder (in^2) | Average diameter of cylinder (in) | Compressive strength of cylinder (psi) | Maximum load on cylinder (lb) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 27.99 | 5.97 | 4278.3 | 119749 | 1 |
2 | 27.99 | 5.97 | 4162.1 | 116497 | 1 |
DIME Test ID: 2015-04-01-3-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 4220
Age of specimen: 7 days
Certified By: Bang Nguyen
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing