Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 215486 DEA: 040A0204 EFIS: 0400000129
QA Service Level: 1
DIST-CO-RTE-PM: 04-SON-1-15-15.7
Work Description: Construct roadway and bridge with structural concrete and CIDH piling
Location Description: District-County-Route-Post Mile: 04-Son-1-R15.0/R15.7
Contractor Name: BRIDGEWAY CIVIL CONSTRUCTORS, INC.
Contractor Address: 4950 Allison Parkway, # A, Vacaville, CA 95688
Resident Engineer: Fabio La Serna Structure Rep.: Bunma Nou
DIME Sample ID: 2022-07-07-63
TL Number from the TL Form:
Sample Submitted By Organization: RMA Group - Rancho Cordova
Sample Organization Contact: (916) 631-7194
Type of Sample: Quality Control
Type of Material: Concrete
Sample Taken Date: 07/07/2022
Date that the sample was received by the laboratory/organization performing the testing: 07/07/2022
The quantity of what the sample constitutes: 100 cy
A brief description of the sample: Concrete
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Bridge Way Civil Construction
The concrete mix design number: 72105003R
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: 3030951
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Scotty Creek Bridge Stem and Soffit
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:
DIME Test ID: 2022-07-07-63-1
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Verified Date: 07/13/2022
Date Tested: 07/07/2022
Submitted By Organization: RMA Group - Rancho Cordova
Organization Address: 3150 Fitzgerald Road,
Organization City: Rancho Cordova
Organization State: CA
Organization Zipcode: 95742
Organization Email: mlowrance@rmacompanies.com
Organization Phone: (916) 631-7194
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
DIME Test ID: 2022-07-07-63-2
Test Method: ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement Concrete
Verified Date: 07/13/2022
Date Tested: 07/07/2022
Submitted By Organization: RMA Group - Rancho Cordova
Organization Address: 3150 Fitzgerald Road,
Organization City: Rancho Cordova
Organization State: CA
Organization Zipcode: 95742
Organization Email: mlowrance@rmacompanies.com
Organization Phone: (916) 631-7194
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
DIME Test ID: 2022-07-07-63-3
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 08/10/2022
Date Tested: 08/04/2022
Submitted By Organization: RMA Group - Rancho Cordova
Organization Address: 3150 Fitzgerald Road,
Organization City: Rancho Cordova
Organization State: CA
Organization Zipcode: 95742
Organization Email: mlowrance@rmacompanies.com
Organization Phone: (916) 631-7194
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Unit system used?
|
US Units
|
Number of specimens
|
2
|
Test performed
|
With no density determined
|
Capped in accordance with?
|
ASTM C617 - Sulfur Mortar Cap
|
Average diameter of cylinder 1
|
6.00 in
|
Average diameter of cylinder 2
|
6.00 in
|
Cross sectional area of cylinder 1
|
28.27 in^2
|
Cross sectional area of cylinder 2
|
28.27 in^2
|
Compressive strength (to nearest 10 psi)
|
6330 psi
|
Maximum load on cylinder 1
|
179830 lb
|
Maximum load on cylinder 2
|
177960 lb
|
Type of fracture pattern of cylinder 1
|
2
|
Type of fracture pattern of cylinder 2
|
5
|
Comment on any defect in either specimen or caps (Max 250 Characters)
|
no data
|
Correction factor for cylinder 1
|
1
|
Correction factor for cylinder 2
|
1
|
Age of specimen
|
28 days
|
Age of specimen in hours
|
0 hours
|